Laserfiche WebLink
3 . Utilities : <br /> Utility coordination with the various Utility Companies and/or agencies shall be <br /> by the ENGINEER and identified conflicts addressed. The ENGINEER will be <br /> prepared, at additional hourly rates, to survey the project site to locate and <br /> determine depth of underground utilities, in coordination with the Utility <br /> Companies . <br /> F . Signing and Pavement Marking Plans <br /> Preparation of the plan layout; key map; quantities (including signing and pavement <br /> marking quantity); tabulation of quantities; and detail of all major signs. All plans are to <br /> be prepared in accordance with the latest design standards and practices (MUTCD), <br /> FDOT Standard Specifications, Indexes, and shall be accurate, legible, complete in design <br /> and drawn at the same scale as the Roadway Plans, furnished in reproducible form. <br /> G. Construction Phase Assistance <br /> Construction phase assistance shall be submitted to the COUNTY under a supplemental <br /> Work Order, if so desired, once the construction documents have been finalized and a <br /> construction duration has been determined. <br /> H. Certification <br /> 1 . The ENGINEER will provide certification to St. Johns River Water Management <br /> District based on As-Built drawings provided by the Contractor ' s licensed <br /> surveyor and information provided by the COUNTY. <br /> 2 , The ENGINEER will provide certification to the Florida Department of <br /> Transportation based on As-Built drawings provided by the Contractor' s licensed <br /> surveyor and information provided by the COUNTY. <br /> SECTION IV - TUNIE FOR COMPLETION <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion <br /> of Probable Construction Cost for the nine projects shall be fifteen ( 15) months. Once permits are <br /> received, 100% design drawings shall be completed 90 days thereafter. <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant <br /> to this Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows : <br /> Roadway Improvements to East CR-510 and North AIA <br /> Task Fee <br /> Lump Sum Components' <br /> Design Survey $455470 <br /> Geotechnical Investigation $ 8 , 515 <br /> Roadway Design $ 1625847 <br /> Total $216, 83 <br /> 8 <br />