My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-416
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:52:24 AM
Creation date
10/1/2015 1:11:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/16/2008
Control Number
2008-416
Agenda Item Number
8.G.
Entity Name
Arcadis U.S. Inc.
Subject
Amendment to Work Order 1 Rockridge Sewer Replacement
Area
Rockridge
Alternate Name
Arcadis G & M Inc.
Supplemental fields
SmeadsoftID
8212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECKLER ENGINEERING, 1NC, <br /> December 4 , 2008 <br /> 211 - 001 . 03 <br /> Mr. Bob Lawson <br /> Arcadis U . S . , Inc . <br /> 2081 Vista Parkway <br /> West Palm Beach , FL 33411 <br /> Dear Mr. Lawson : <br /> Reference : Eckler Engineering 's Additional Services <br /> Rockridge Mitigated Sewer System <br /> Indian River County <br /> Eckler Engineering has provided significant design and construction services beyond the original <br /> construction scope . We are requesting a modification to our original agreement due to the <br /> additional services we have completed during the construction of this project . Please submit this <br /> request to Mr. Larry Brown for his review and approval by the County. <br /> Eckler Engineering has provided additional services beyond thatwhich was in the original contract <br /> for services during construction . Eckler Engineering has provided the following additional services <br /> during the construction of this project: <br /> 1 . We had to visit the project site on three separate occasions for startup of the <br /> vacuum pump station and for flow testing of the collection system . Airvac , Inc . had <br /> problems in their control panel with the instrumentation and control system and the <br /> contractor was not fully prepared for the testing which caused the first two attempts <br /> at testing the system to be aborted . We were finally able to successfully test the <br /> system on our third attempt. This work took an additional three days for two people <br /> to complete this task . <br /> 2 . Eckler Engineering has worked with the County's request for DATAFLOW Systems , <br /> Inc. to provide SCADA services to the vacuum pump station . In order to get the <br /> SCADA system to provide the signals requested by the County, Eckler Engineering <br /> has had to provide the coordination between Airvac, the supplier of the control <br /> panel , DATAFLOW , and the County. We first verified what the County wanted to <br /> monitor, determined that these signals were available within the Airvaccontrol panel <br /> and then coordinated the transfer of these signals from the Airvac panel to the <br /> DATAFLOW system . This effort took a while since Airvac uses a 120 volt control <br /> system and DATAFLOW uses a 24 volt control system . We also needed to find a <br /> way to obtain signals directly out of their PLC control and how to arrange these <br /> additional controls and connection points within the existing panel and still meet UL <br /> requirements . This effort has taken approximately two man weeks to complete . <br /> T We added the hydrogen sulfide sensor into the plans and modified the control <br /> system to accept the signal from the H2S sensor. <br /> l 'eIvitrttrl' t g t, ttir 23rd Yea 11 ( St' ri to It IIf 'Ito IIIIt I1,fAt it It $ <br /> r ^, NdF7 `„nk. firell'C ` itrlr ri=j . <br /> +`A, 4 ( ,r, idCt k rP1 Y;T r <br /> I v_ V <br />
The URL can be used to link to this page
Your browser does not support the video tag.