My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-323
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 1:37:11 PM
Creation date
9/30/2015 11:20:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/18/2007
Control Number
2007-323
Agenda Item Number
11.J.2
Entity Name
Giannetti Contractors Corp.
Subject
Change Order No.1
Rockridge Sub. Mitigated Sewer Replacement
Area
Rockridge
Project Number
2521
Supplemental fields
SmeadsoftID
6615
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it I _- <br /> Cl - le 01 <br /> ATTACHMENT # 1 3a <br /> GIANNETTI CONTRACTING <br /> Main Office CORPORATION Florida Office <br /> 6340 Sims Dr. 2660 N .W. 150 Court, Ste. 108 <br /> Sterling Heights, Michigan 4831 $ Pompano Beach, Florida 33069 <br /> Phone : (586) 268-2090 Phone: (954) 972-8104 <br /> Fax: (586) 268.7099 Fax: (954) 972-8108 <br /> Lic.# CB-CO57979 BVILDING • DEVELOPMENT • INFRASTRUCTURE Lia# CU-CO56976 <br /> August 3, 2007 <br /> Eckler Engineering <br /> 4700 Riverside Dr. Suite 110 <br /> Coral Springs, FL 33067 <br /> ATTN: Evan Kennedy <br /> RE: Mitigated Sewer Rockridge Subdivision Indian River County project # UCP 2521 <br /> Dear Mr. Kennedy, <br /> Please find listed below additional casts for the work as described below, as requested by the owner. <br /> Item # 1 Clear and grub canal banks and easement and sod @ treatment facility. <br /> Bahia sod restoration 900000 SF $ 0.20 $ 16,000.00 <br /> Trucking off debris and excess soil 600 CY $ 5.00 $ 4,000, 00 <br /> Labor and equipment for grading and excavation 10000 SY S 2.00 $ 20,000.00 <br /> Total for Item # 1 $ 42,000.00 <br /> Item # 2 Remove existing culverts and replace with 12" ADS pipe @ driveways crossings on vacuum sewer side <br /> esirlwalind 49 1 r nor driveways = approximately 3,100 LF, <br /> 12" ADS pipe materials 3100 S 5.83 $ 18,073.00 <br /> 12" ADS Couplings 104 EA $ 5.83 $ 606.32 <br /> Remove and dispose ex culverts $ 2. 00 $ 6,200.00 <br /> Lahar and equipment 3100 LF 10.00 $ 31 ,0091 <br /> Estimated Total for 7t (!! <br /> $ 55,879.32 <br /> Price per 2 $ 18.03 <br /> Item ##33 remove ex CMP drainage culvert @ roadways crossings and replace with hardie pipe. <br /> Remove anAai+'pOca-er culvert 446 LF $ 2. 00 $ 87.00 <br /> Connect new CMP to ex structures 16 EA $ 500.00 S✓9'Q , 00 <br /> Labor and equipment to install 12" - 16" hardle pipe 446 LF .00 S 4,460.00 <br /> 12" hardie pipe materials only $ 12,99 $ 2,078.40 <br /> 15" hardle pipe materials only S 12.99 $ 2,675.94 <br /> 15" hardie pipe materials only 80 LF 14. 31 $ 1 , 144.80 <br /> Asphalt restoration ( at prices) 250 LF $ $ 26,00D.00 <br /> Sidewalk r n at contract unit prices) 5 LF $ 44. 00 000l <br /> Total for item # 3 $ 483471 .14 pg <br /> Connect now CMP to ex structures includes removing ox GMP from invert and making new connection to ex structure, <br /> and cementing new CMP to inlet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.