My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-061
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:30:03 AM
Creation date
9/30/2015 9:32:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/21/2006
Control Number
2006-061
Agenda Item Number
7.T.
Entity Name
Malcolm Pirnie, Inc.
Subject
Agreement for professional services for Rockridge Subdivision
Supplemental fields
SmeadsoftID
5468
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 to the AGREEMENT FOR PROFESSIONAL SERVICES <br /> GENERAL DESCRIPTION OF THE PROJECT SCOPE <br /> In 2004 , Hurricane Frances caused serious flooding damage to homes in the <br /> Rockridge subdivision . The homes were flooded during the hurricane by storm <br /> surges from the Indian River Lagoon . The Work under this Agreement includes <br /> but may not be limited to professional land surveying , engineering design , <br /> permitting , bidding , and construction administration services for a flood protection <br /> system for the Rockridge Subdivision , hereinafter referred to as the "Rockridge <br /> Surge Protection Project. " Particular services are described in general detail <br /> below: <br /> 1 . Perform initial land surveying services (vertical and horizontal ) as <br /> necessary to allow the preparation of a Preliminary Engineering Design <br /> Report. <br /> 2 . Prepare a Preliminary Engineering Design Report . Said report will provide <br /> an analysis of the alternative recommended in the Rockridge Subdivision <br /> Surge Protection Project — Hazard Mitigation Grant Program/Flood <br /> Mitigation Assistance (HMGP/FMA) Application , prepared on May 2 , 20057 <br /> by PBS &J . <br /> 3 . Based on the results of the Preliminary Engineering Design Report , <br /> provide final land surveying services , prepare final construction drawings , <br /> bid documents , construction contract documents , and technical <br /> specifications for the Rockridge Surge Protection Project. Also provide <br /> related permitting and bidding services . Improvements include but may <br /> not be limited to , the installation of one or more pump stations , weirs , <br /> gates , and jersey barriers installed at the inlets/outfalls or overflows into <br /> the subdivision and sized based on a design flood elevation of no less <br /> than 6 . 5 feet MSL (final design flood elevation to be selected by County) . <br /> 4 . Provide construction administration services , including construction <br /> inspection services . <br />
The URL can be used to link to this page
Your browser does not support the video tag.