Laserfiche WebLink
ATTACHMENT 1 to WORK ORDER NO . 4-RR <br /> PROFESSIONAL ENGINEERING SERVICES for REVISIONS to the <br /> ROCKRIDGE SUBDIVISION SURGE PROTECTION PROJECT <br /> INTRODUCTION/OVERVIEW <br /> Indian River County (the "County" ) has requested that Malcolm Pirnie , Inc. (the <br /> "CONSULTANT" ) prepare revisions to the final design specified in WORK ORDER NO . <br /> 3-RR, including estimate of probable construction costs , necessary construction <br /> drawings and specifications , and permitting documents for implementation of the <br /> stormwater system improvements for the Rockridge Subdivision Surge Protection <br /> Project . The revisions are required because the pump station site has been relocated . <br /> The relocation was initiated by the City of Vero Beach and agreed upon by the County <br /> to accommodate the development plans for the former post office property/site . The <br /> action of the relocated site was approved on June 28 , 2007 at a meeting of the City <br /> Council of the City of Vero Beach . <br /> The purpose of this project, and as outlined in WORK ORDER NO . 3-RR, is to provide <br /> flood protection features along Indian River Boulevard to include sluice gates and flap <br /> gates on nine different existing storm drainage structures , provide a tilting weir <br /> arrangement at the canal adjacent to 14th Street, and a pump station arrangement in the <br /> 16th Street canal . The pump station site will be located at the southwest corner of the <br /> City of Vero Beach property, which is located at the southwest corner of the intersection <br /> of 17th Street and Indian River Blvd . The project revisions also include potential for <br /> culverting the 16th canal from the pump station site to the west right-of-way of Indian <br /> River Blvd . , together with required canal and embankment improvements to the 16th <br /> Street canal east of Indian River Blvd . to the Indian River Lagoon , and the north/south <br /> residential canal adjacent to and south of the 16th Street canal south of the relocated <br /> pump station site . The project also includes the installation of earth berms along Indian <br /> River Boulevard to prevent flood waters from crossing west across the highway. The <br /> pro�ect limits along Indian River Boulevard are just south of 12th Street to approximately <br /> 20t Street. <br /> The proposal assumes that the project will be designed , permitted , bid , and constructed <br /> as a single project . The proposal outlined below presents the scope of work, estimated <br /> fees , and completion schedule for the necessary engineering services related to the <br /> preparation of the final design contract documents , and providing permitting and bidding <br /> services for the proposed stormwater system improvements. Other work pertinent to <br /> bidding and constructing this project is included in Work Order No . 3-RR, dated October <br /> 24 , 2006 . <br /> 1. 0 PROJECT KICKOFF MEETING <br /> Attend project kickoff meeting for discussion of the design revisions , subsequent to the <br /> City of Vero Beach approval of the site location . The meeting will include <br /> representatives of the County and City of Vero Beach , as necessary, to discuss scope <br /> 2 <br /> F1Public WorWKeithM\Stomwater ProjectslRockridge SubdivisionMork OrderslWork Order #4%Work Order #4-RR - August 9. <br /> 2008.doc <br />