Laserfiche WebLink
i <br /> i <br /> E3111113IT "E" <br /> 26TH STREET ROADWAY WIDENING <br /> (58TH AVENIJE TO 43" AVENUE) <br /> ENGINEER'S OPINION OF PROBABLE COSTS <br /> Based on comparative analysis performed by Kenley-Horn. & Associates, Inc, for 30% Complete <br /> Construction ]?tans for Aviation Boulevard Segment between US Highway 1 and 43d Avenue <br /> • Earthwork $ 436,000 <br /> • Paving $ 2,324,057 <br /> ® Curbing $ 280,118 <br /> i <br /> a Drainage $ 771,815 <br /> m Sidewalks $ 1929500 <br /> ® Striping / Signage $ 763667 <br /> m Sigualization $ 2253000 <br /> o Landscape ( Irrigation $ 443,750 <br /> a Ilardscape $ 650,000 i <br /> • Lighting $ 387,500 <br /> • ]Miscellaneous (Mobilization, Maint. Traffic, Elect., etc.) t$' 19212)500 <br /> • Engineering / Surveying 53Z,595 <br /> Sub=Total $ 628373802 <br /> o Contingencies (10 %) ' 683 ,780 <br /> TOTAL 7,521,582 <br />