Laserfiche WebLink
E3111113IT "E" <br />26TH STREET ROADWAY WIDENING <br />(58TH AVENI3E TO 43" AVENUE) <br />ENGINEER'S OPINION OF PROBABLE COSTS <br />Based on comparative analysis performed by Kenley -Horn. & Associates, Inc. for 30% Complete <br />Construction ]?tans for Aviation Boulevard Segment between US Highway 1 and 43d Avenue <br />m <br />Earthwork <br />$ 436,000 <br />e <br />Paving <br />$ 2,324,057 <br />® <br />Curbing <br />$ 280,118 <br />a <br />Drainage <br />$ 771,815 <br />m <br />Sidewalks <br />$ 1929500 <br />® <br />Striping/Signage <br />$ 763667 <br />m <br />Sigualization <br />$ 2253000 <br />o <br />Landscape ( Irrigation <br />$ 443,750 <br />a <br />Ilardscape <br />$ 650,000 <br />a- <br />Lighting <br />$ 387,500 <br />m <br />]Miscellaneous (Mobilization, Maint. Traffic, Elect., etc.) <br />t$'13212)500 <br />• <br />Engineering/Surveying <br />53Z,595 <br />Sub=Total <br />$ 628373802 <br />o <br />Contingencies (10%) <br />' 683,780 <br />TOTAL $ 71521,582 <br />