My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-129
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 4:22:06 PM
Creation date
9/30/2015 6:35:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/03/2003
Control Number
2003-129
Agenda Item Number
11.H.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Plant RO Clearwell addition and post-treatment modifications
Work Authorization No. 3
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3263
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Provide 2 days of support for the pretreatment piping modifications for onsite <br /> assistance with plant shutdowns, and variable manipulations to allow operations in <br /> the various phases of the construction process . <br /> 2 . Provide up to 2 weeks commissioning and startup support including : programming of <br /> the VFD 's minimum and maximum speed setpoints ; loading the modifications to the <br /> existing HMI system to incorporate the changes ; checkout all new and relocated <br /> points and PLC remote UO communications in association with the contractors loop <br /> checks ; startup and verify operation of the entire plant; provide up to 2 days of <br /> operator/maintenance training . <br /> Task 6 — Record Information <br /> 1 . Provide an as-built PLC program listing and a copy of all files on a floppy diskette for <br /> the O&M manual , and owner. <br /> 2 . Provide one-year warranty on all work, any call out for non-warranty related issues <br /> will be billed at hourly rate portal to portal from Bradenton, FL . <br /> Task 7 — Firmware/Hardware/As-builts <br /> 1 . Assist with the updating the firmware/hardware for all existing A-B processors and <br /> adapter modules, with the assistance of the local Rexel representative, to bring all <br /> hardware up to the latest software revisions, and allow the modification of the <br /> existing DH+ and RemotelO channel configurations to increase the communications <br /> speed from 57 . 6 K to 230 . 4 K in preparation for the new additional racks to be <br /> installed with this expansion . <br /> 2 . Purchase and install one package of RSLogix5 Professional , part no . 9324- <br /> RL5700NXENE, programming software on the new computer provided by others <br /> under this contract, to connect with the PLC via ethernet to allow the County <br /> personnel to modify and troubleshoot the PLC program . <br /> 3 . Create 1 -3 schematic drawings detailing the specific modifications within the existing <br /> PLC cabinet(s) for all circuits/signals being removed/relocated . (Could be optional <br /> $ 3 ,450) <br /> SCHEDULE <br /> These services will be coordinated with the contractor ' s schedule in order to insure no <br /> delays in construction . It is anticipated that these services will be provided over the next <br /> nine months . <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.