My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-010
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:31:28 AM
Creation date
9/30/2015 11:54:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/08/2008
Control Number
2008-010
Agenda Item Number
11.J.2
Entity Name
Schulke ,Bittle & Stoddard
Masteller & Moler
Subject
Work Order No.5 Services Agreement
Work Order No. 11 Services Agreement
Supplemental fields
SmeadsoftID
6834
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> ATTACHMENT 'B' <br /> CONSTRUCTION COST ESTIMATE <br /> UTI[ I �Y r6. 6WORK SNEI�U� ' SR Gt1 UTILITY CQNFLiCTS <br /> FINANCIAL PROIEtFID,-221627-.1-52-01 December 11, 2007 <br /> ITEM NO. STA. DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE <br /> 24 2472+43. 7141 .8' WM 16" DIP CONFLICT W/18" PIPE - CUT/REMOVE 20 LF 16" DIP LS 1 <br /> LT. $ 1, 500.00 <br /> $ 1,500.00 <br /> 25 LT75+ 13.75 42.T WM 16" DIP CONFLICT W/18" PIPE - CUT/REMOVE 20 LF 16" DIP LS 1 <br /> $1,500.00 $1,500.00 <br /> 26 NOT ACCURATELY WM - ( 12") - CONFLICT W/60" PIPE @ CITRUS LEAGUE DRIVEWAY - <br /> LOCATED VERTICAL DEFLECTION LS 1 $ 18,808.00 $18,808.00 <br /> 27 NOT ACCURATELY WM - (8") - CONFLICT W/60 ' PIPE @ 79TH AVE - VERTICAL <br /> rNOTACCURATELY <br /> D DEFLECTION LS 1 $16,370.00 $ 16,370.00 <br /> E <br /> URATELY WM - (8") CONFLICT W/60" PIPE @ 78TH AVE - VERTICAL <br /> DEFLECTION LS 1 $ 16,370.00 $16,370.00 <br /> URATELY WM - (6") - CONFLICT W/60" PIPE @ 75TH DR./CRT. - VERTICAL <br /> DEFLECTION L5 1 $16,370.00 $16,370.00 <br /> 30 2 <br /> FM - UNKNOWN " » - <br /> LOCATED ( - . ) CONFLICT W/60" (@MRS. B'S) LS 1 $5,000.00 $5,000. 00 <br /> SFA 2463+60 TO WM 12" DIP - NUMEROUS CONFLICTS AND DETERIORATED - <br /> 31 2475+40 REPLACE WITH 1180 LF 12" PVC AND HDPE LS 1 $ 155, 150.00 $155, 150. 00 <br /> SEEATTACHED PG. 5 OF 6 <br /> STA 2430+05 TO NEW 865 LF WM - 12" PVC - LOOP CONNECTION ON SOUTH <br /> 32 2438+70 SIDE SR 60, EAST OF 82ND AVE LS 1 $71,080.00 $71,080. 00 <br /> SEE ATTACHED PG. 6 OF 6 <br /> SUB TOTAL 1 375 700.00 <br /> 33 SURVEY STAKE-OUT/AS-BUILTS LS 1 $300000.00 $30,000.00 <br /> 34 MOBILIZATION LS 1 $60,000.00 $60,000.00 <br /> SUBTOTAL1465 700.00 <br /> CONTINGENCY @ 10% 146t570.00 <br /> TOTAL CONSTRUCTION Ci $lo6l2p27O.00 <br /> 1. ALL VERTICAL DEFLECTIONS, DIRECTIONAL BORES, AND PIPE REPLACEMENT INCLUDES: DBL LINE STOPS, PIPE, (2) GATE VALVES, DEWATERING, <br /> FrMNGS, TESTING AND RESTORATION. OTHER REQUIREMENTS VARY PER CONFLICT/SITUATION, INCLUDING M.O.T., REPAVING, AIR RELEASE <br /> VALVES (F.M. ONLY), PUMP-OUT (F, M . ONLY). <br /> 2. CUT/REMOVAL OF 20 LF TO AVOID CONFLICTS IS INCIDENTAL TO THE GROUTING WORK - CONTRACTOR MUST OPEN PIPE IN INTERVALS TO FULLY <br /> GROUT PIPE. THE $1,500.00 ESTIMATE IS TO COVER M.O.T. COSTS, AND PAVEMENT RESTORATION WHEN APPLICABLE. <br /> 2 of <br /> SR 60 UTILITY CONFLICTS <br /> CONSTRUCTION COST ESTIMATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.