My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-010
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:31:28 AM
Creation date
9/30/2015 11:54:37 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> ATTACHMENT 'B' <br /> CONSTRUCTION COST ESTIMATE <br /> UTI[ I �Y r6. 6WORK SNEI�U� ' SR Gt1 UTILITY CQNFLiCTS <br /> FINANCIAL PROIEtFID,-221627-.1-52-01 December 11, 2007 <br /> ITEM NO. STA. DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE <br /> 24 2472+43. 7141 .8' WM 16" DIP CONFLICT W/18" PIPE - CUT/REMOVE 20 LF 16" DIP LS 1 <br /> LT. $ 1, 500.00 <br /> $ 1,500.00 <br /> 25 LT75+ 13.75 42.T WM 16" DIP CONFLICT W/18" PIPE - CUT/REMOVE 20 LF 16" DIP LS 1 <br /> $1,500.00 $1,500.00 <br /> 26 NOT ACCURATELY WM - ( 12") - CONFLICT W/60" PIPE @ CITRUS LEAGUE DRIVEWAY - <br /> LOCATED VERTICAL DEFLECTION LS 1 $ 18,808.00 $18,808.00 <br /> 27 NOT ACCURATELY WM - (8") - CONFLICT W/60 ' PIPE @ 79TH AVE - VERTICAL <br /> rNOTACCURATELY <br /> D DEFLECTION LS 1 $16,370.00 $ 16,370.00 <br /> E <br /> URATELY WM - (8") CONFLICT W/60" PIPE @ 78TH AVE - VERTICAL <br /> DEFLECTION LS 1 $ 16,370.00 $16,370.00 <br /> URATELY WM - (6") - CONFLICT W/60" PIPE @ 75TH DR./CRT. - VERTICAL <br /> DEFLECTION L5 1 $16,370.00 $16,370.00 <br /> 30 2 <br /> FM - UNKNOWN " » - <br /> LOCATED ( - . ) CONFLICT W/60" (@MRS. B'S) LS 1 $5,000.00 $5,000. 00 <br /> SFA 2463+60 TO WM 12" DIP - NUMEROUS CONFLICTS AND DETERIORATED - <br /> 31 2475+40 REPLACE WITH 1180 LF 12" PVC AND HDPE LS 1 $ 155, 150.00 $155, 150. 00 <br /> SEEATTACHED PG. 5 OF 6 <br /> STA 2430+05 TO NEW 865 LF WM - 12" PVC - LOOP CONNECTION ON SOUTH <br /> 32 2438+70 SIDE SR 60, EAST OF 82ND AVE LS 1 $71,080.00 $71,080. 00 <br /> SEE ATTACHED PG. 6 OF 6 <br /> SUB TOTAL 1 375 700.00 <br /> 33 SURVEY STAKE-OUT/AS-BUILTS LS 1 $300000.00 $30,000.00 <br /> 34 MOBILIZATION LS 1 $60,000.00 $60,000.00 <br /> SUBTOTAL1465 700.00 <br /> CONTINGENCY @ 10% 146t570.00 <br /> TOTAL CONSTRUCTION Ci $lo6l2p27O.00 <br /> 1. ALL VERTICAL DEFLECTIONS, DIRECTIONAL BORES, AND PIPE REPLACEMENT INCLUDES: DBL LINE STOPS, PIPE, (2) GATE VALVES, DEWATERING, <br /> FrMNGS, TESTING AND RESTORATION. OTHER REQUIREMENTS VARY PER CONFLICT/SITUATION, INCLUDING M.O.T., REPAVING, AIR RELEASE <br /> VALVES (F.M. ONLY), PUMP-OUT (F, M . ONLY). <br /> 2. CUT/REMOVAL OF 20 LF TO AVOID CONFLICTS IS INCIDENTAL TO THE GROUTING WORK - CONTRACTOR MUST OPEN PIPE IN INTERVALS TO FULLY <br /> GROUT PIPE. THE $1,500.00 ESTIMATE IS TO COVER M.O.T. COSTS, AND PAVEMENT RESTORATION WHEN APPLICABLE. <br /> 2 of <br /> SR 60 UTILITY CONFLICTS <br /> CONSTRUCTION COST ESTIMATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.