Laserfiche WebLink
EXHIBIT I - ATTACHMENT C <br /> ITEMIZED BID SCHEDULE ADDENDUM #2 330-2009 <br /> PROJECT NAME : 16TH STREET FROM 74TH AVE TO 66TH AVENUE <br /> AND 66TH AVENUE FROM 16TH STREET TO S. R. 60 <br /> PROJECT #9810-A, #9920 , #0546 /BID 92009037 <br /> BIDDER'S NAME : C- <br /> ,r <br /> REVISED LINE ITEMS <br /> Item No. - Description Unit cmantity Unit Price Amount <br /> I <br /> 1080-11 -45 UTILITY FIXTURES Cr BLOW-OF EA 1 11451 .00 $1 451 .00_ <br /> 1080-11 -46 UTILITY FIXTURES AIR RELEASE VALVE E.A 11 6 .090.00 $66990.00 <br /> 1080-11 -49 UTILITY FIXTURES SPECIAL 16" JOINT RESTRAINERS) EA 42 609. 00 <br /> 1080- 11 -49-A UTILITY FIXTURES SPECIAL 12" JOINT RESTRAINERS EA 32 390.00 512F480 .00 <br /> 1643-700 VALVE BOXADJUSTMENT EA 8 364.00 $2 ,912 . 00 _ <br /> 1844-133-06 FIRE HYDRANT ASSEMBLY (WI ANCHORING FITTINGS) EA 12 2117 .00 525 404 .00 <br /> i <br /> 1644-800 FIRE HYDRANT ASSEMBLY RELOCATION EA 1 1124.00 $ 1 , 124, 00 <br /> 1615-600 WATER METER RELOCATION EA 1 843.00 $843.00 <br /> UTILITY IMPROVEMENTS TOTAL sal ,3as.a6 <br /> ISCELLANEOUS <br /> 800 PAYMENT BOND mm , LS 1 .00 514 000 .00 <br /> 601 PERFORMANCE BOND L 1 13 000.00 s13 000.00 <br /> I <br /> 802 TRENCH SAFETY COMPLIANCE OVER 6 SEE SE 1 1 040.00 $1 .040 . 00 <br /> 1803 rTRENCH SAFETY COMPLI HORING SEE SEC. 00454 LS 1 2 080.00 $2, 080.00 <br /> M aedANEOlus TOTAL 30, 120.00 <br /> OVERALL PROJECT TOTAL 3 ,794,363 .84 <br /> L000000 <br /> LS = lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton CY = Cubic Yards <br /> AS= Assembly LSS = Pounds NM = Net Miles PI = Per Intersection MH = Man Hours <br /> NOTE :-IF-THERE IS-A DICCREPPNCY-RFTWEEN- THE- PLANS- (SUMMARY- OF- PAY- ITEMS) <br /> AND THE ITEMIZED BID SCHEDULE THE 131D DOCUMENTS WILL GOVERN . <br /> SHEET 4 OF 4 <br />