My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-091
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 2:27:45 PM
Creation date
10/1/2015 12:02:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-091
Agenda Item Number
11.J.1
Entity Name
Schulke,Bittle & Stoddard
Subject
Work Order No.6 Pump Station No. 2058
Area
37th St., Healthsouth
Project Number
UCP 2784
Supplemental fields
SmeadsoftID
6937
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT ` I ' <br /> SCOPE OF WORK <br /> WORK ORDER NO. 6 <br /> Project Description <br /> The proposed project will provide engineering design and permitting for the construction <br /> of upgrades and modifications to existing lift station no . 2058 , which is located adjacent <br /> to 37" St., east of US Hwy . 1 , in front of the Health South Treasure Coast Rehabilitation <br /> Hospital . Modifications and upgrades are necessary to this station because it is not <br /> operating at optimum conditions; rather it appears to be operating beyond its design <br /> capacity which is causing the pumps to cycle too frequently . Consequently, electrical <br /> components are wearing out prematurely, and I .R. C . D . U . S . is realizing increased <br /> maintenance expense and reduced station reliability. The upgrade for the lift station is <br /> anticipated to consist of replacing and upsizing the wet well, and related force main, <br /> gravity sewer and electric modifications to accommodate the new wet well . Existing <br /> pumps, electric controls/panel, generator and piping will remain, with necessary <br /> modifications . <br /> Scope of Services <br /> Schulke, Bittle & Stoddard, L . L. C. will provide services including base map preparation, <br /> engineering design, lift station calculations, preparation of construction plans, preparation <br /> and submittal of permit applications, preparation of Specifications and Bid Documents <br /> utilizing Standard IRC Bid Documents, construction administration and periodic <br /> construction field inspection for the construction required for upgrading/modifying of the <br /> existing lift station no . 2058 . (See Attachment "A" for location and Attachment "B" for <br /> cost tabulation) . <br /> The estimated construction cost of this project is $ 132 ,000 . 00 <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule, Schulke, Bittle & Stoddard , L .L . C . is using the following sub-consultants: <br /> Houston, Schulke, Bittle & Stoddard, LLC, Inc. for necessary survey <br /> information. <br /> In connection with this project, the County will provide the Engineer with a copy of any <br /> pertinent Preliminary Data or Reports ; all available drawings in electronic Autocad <br /> format ; all surveys, maps and other documentation in the possession of or reasonably <br /> available to the County that are pertinent to the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.