Laserfiche WebLink
ESTIMATE COST OF IMPROVEMENTS <br /> NEW 12" WATER MAIN <br /> Estimated Unit of <br /> Item Description Quantity Measure Unit Price Total Price <br /> 1 Mobilization 1 LS $ 15 000 . 00 $, 15- 10- 00m <br /> 2 30" x 12" Tapping SleevelValve 1 LS $ 11 ,500 .00 $ 11 ,500 . 00 <br /> 3 12" H .D . P .E. Directional Bore 58th Ave 133 LF $65 .00 $80645 . 00 <br /> 4 TemD Jumper Connection 1 LS $2 ,500 .00 $2 , 500 . 00 <br /> 5 12" PVC Water Main 1182 LF $45 . 00 $ 53 , 190 . 00 <br /> 6 8" HDPE Dir. Bore 2 Bores at 77th St. 120 LF $45 . 00 $ 5 ,400 00 <br /> 7 Testing 1 LS $2X0 .00 $ 2 ,000 . 00 <br /> 8 12" M. J.G .V. 2 EA $21500 . 00 $5 1 o00 . N <br /> 9 Fire H drant Assembly W/6" G .V. 2 EA $4 , 500 . 00 $ 9 , 000 . 00 <br /> 10 Water Service 1 EA $750 . 00 $ 750 00 <br /> 11 2" Blow Off 1 EA $750 .00 _ $ 750 . 00 <br /> 12 Connect toEbstin 1 LS $ 1 , 000 . 00 $ 1 , 000 . 00 <br /> 13 Restoration 1 LS $50000 . 00 $50000 . 00 <br /> i4 Surve Stake Out/ As Builts 1 LS $3 ) 000 . 00 $ 3 , 000 . 00 <br /> Subtotal : $ 122 , 735 . 00 <br /> Contingency 109'0 : $ 12 , 273 .50 <br /> TotalIm rovern Cost: $ 13508 . 60 <br /> Attachment 1 <br />