Laserfiche WebLink
INDIAN RIVER COUNTY DEPARTMENT OF UTILITIES <br /> COST ESTIMATE <br /> PROJECT: SR 60 PHASE III <br /> Bid Item Estimated Unit of <br /> Unit Price Total Price , <br /> Item No. Description Quantity Measure <br /> 5 Conflict No. S- Water Main Replace 12" Dip- Sta . 2374+40 <br /> (a) • 16" H .D.P.E. 150 LF $120.00 $ 18,000.00 <br /> (b) *Remove 12 20 LF 1 EA $1,500.00 $ 1,500.00 <br /> (c) • Grout 12" 105 LF $ 17.00 $ 1,785.00 <br /> SUBTOTAL $21,285.00 <br /> L(b) <br /> Conflict No. 6- Force Main Deflection- 12" Sta. 2380+00 <br /> • 12" P.V.C. 50 LF $100.00 $5,000.00 <br /> • 12" MJ .G.V. 2 EA $3,800.00 $7,600.00 <br /> • 4" A.R.V. with Manhole 1 EA $6,400.00 $6,400.00 <br /> • 12" Line Stop 2 EA $6,500.00 $ 13,000.00 <br /> • Connect to Existing (Both Ends) with Tapping Sleeve/Valves 1 LS $15,000.00 $ 15,000.00 <br /> • Remove Existing Force Main ( 12" )- 40 LF 1 EA $1,500.00 $ 1,500.00 <br /> SUBTOTAL $48500.00 <br /> 7 Conflict No. 7- Force Main Replace 12" Sta. 2382+15 to 2384+65 <br /> (a) • 12" P.V.C. 260 LF $50.00 $ 13,000.00 <br /> (b) • 4" P.V.C. 10 LF $28.00 $280.00 <br /> (c) • 12" M.1 .G.V. 2 EA $3,800.00 $7,600.00 <br /> (d) •4" MJ .G .V. 1 EA $950.00 $950.00 <br /> (e) •4" A.R.V. with Manhole 0 EA $6,400.00 $0.00 <br /> (f) • 12" Line Stop 2 EA $6,500.00 $ 13,000.00 <br /> (g) •Connect to Exist. 12" (Each End) with Tapping Sleeve/Valves 1 LS $ 15,000.001 $ 15,000.00 <br /> (h) *Connect to 2" Force Main 1 LS $11000.00 $1,000.00 <br /> (i) *Remove Exist. Force Main (12")- 60 LF 3 EA $1,500.00 $4,500.00 <br /> 0) *Grout Exist. Force Main ( 12") 190 LF $ 17.00 $3,230.00 <br /> SUBTOTAL $58,560.00 <br /> FConflict No. 8- Force Main Deflection- 10" Sta. 2386+30 <br /> • 10" P.V.C. 50 LF $90.00 $4,500.00 <br /> • 10" MJ .G .V. 2 EA $2,500.00 $5,000.00 <br /> • 4" A.R.V. with Manhole 1 EA $6,400.00 $6,400.00 <br /> • 10" Line Stop 2 EA $5,850.00 $11,700.00 <br /> • Connect to Existing (Each Ends) with Tapping Sleeve/Valves 1 LS $12,000.00 $ 12,000.00 <br /> *Remove Exist. Force Main ( 12")- 40 LF 1 EA $ 1,500.00 $1,500.00 <br /> SUBTOTAL $41, 100.00 <br /> F(b) <br /> Conflict No. 9- Water Main Deflection- 12" Sta. 2386+10 <br /> 12" P.V.C. 50 LF $ 100.00 $5,000.00 <br /> • 12" M .1 .G.V. 2 EA $3,800.00 $7,600.00 <br /> • 2" A.R.V. with Manhole 1 EA $6,400.00 $6,400.00 <br /> • 12" Line Stop 2 EA $6,500.00 $13,000.00• Connect to Existing ( Each Ends) 1 <br /> LS $6,300.00 $6,300.00 <br /> • Remove Existing Water Main-12"-40 LF 1 EA $1,500.00 $ 1,500.00 <br /> SUBTOTAL $39,800.00 <br /> Pape2o 6 <br />