My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-056
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 9:14:45 AM
Creation date
9/30/2015 6:23:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/04/2003
Control Number
2003-056
Agenda Item Number
11.H.2.
Entity Name
SDG Kings, Inc.
Subject
The Oaks of Vero P.D./force main 11H.2
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT-B <br /> ESTIMATED COST OF IMPROVEMENTS <br /> Item Description Estimated Unit of Measure Unit Price Total Price <br /> Quantity <br /> 1 Connect to existing 1 LS 2500 .00 $2500 . 00 <br /> 2 6" PVC 2390 LF 13 . 50 $ 329265 .00 <br /> 3 6" G.V. 6 EA 750 .00 $4500 .00 <br /> 4 MJ Fittings (ph I) 11 EA 225 .00 $2475 .00 <br /> 6 Testing 1 LS 500 .00 $ 500 .00 <br /> 7 Reset Guardrail 1 LS 2500 . 00 $2500.00 <br /> 8 Restoration 2400 LF 3 . 50 $ 8400 .00 <br /> 9 6" Flanged DIP/Bridge 110 LF 45 .00 $4950 .00 <br /> crossing <br /> 10 Blow-off Valve on 1 EA 3 ,500 . 00 $39500.00 <br /> Bridge <br /> 11 Mobilization 1 EA 39000 .00 $ 33000 .00 <br /> Subtotal $64,590 .00 <br /> Contingency 10% 61459 .00 <br /> Survey 2000 .00 <br /> Design 2500 .00 <br /> Permitting 1500 . 00 <br /> Bidding & Award 500 .00 <br /> Services During Construction 750 . 00 <br /> Administration 250 .00 <br /> Payment & Perform Bond 2000.00 <br /> Total Improvement Cost $ 80,549 .00 <br /> Estimated County Share $559679 . 71 <br /> Developer' s Share $24,869.29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.