My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
personnel and subcontractors are informed of any modifications to any such applicable permits, <br /> ordinances, statutes, laws, rules or regulations. <br /> 11 . 1 Workers' Compensation Coverage. The CONTRACTOR shall purchase and <br /> maintain workers ' compensation insurance for all workers' compensation obligations <br /> imposed by state law and any other applicable local, state and federal laws, including, <br /> but not limited to Longshore Harbor Workers' Compensation Act and the Jones Act. <br /> 12 . REPORTING REQUIREMENTS <br /> The CONTRACTOR shall be required to prepare and submit to the COUNTY the Contractor' s <br /> Daily Quality Control Report (Appendix G), which includes Dredge Position Printouts, Dredged <br /> Volumes, Construction Stake Inventory, Turbidity Monitoring Reports and Chart, and Sea Turtle <br /> Observer's Report. The Contractor's Daily Quality Control Report , signed and dated by the project <br /> superintendent, with attachments is due to the COUNTY on a daily basis by noon on the following <br /> business day. Reports shall be provided from the first day of mobilization to the last day of work <br /> including site restoration and shall include a narrative describing the length and nature of any delays <br /> in work . <br /> 13 . MONITORING AND ENVIRONMENTAL PROTECTION REQUIREMENTS <br /> This section addresses the minimization and/or prevention ofenvironmental damage and pollution as <br /> the result of construction operations under this contract. For the purpose of these specifications, <br /> environmental damage and pollution are defined as specified in Section 5.5 of these Technical and <br /> Environmental Specifications. The control of pollution and environmental damage requires <br /> consideration of air, water, land, cultural resources, and the marine environment and includes <br /> management of construction activities, visual aesthetics, noise, and solid wastes as well as other <br /> pollutants. The CONTRACTOR should include the cost for complying with these requirements in <br /> the line item for Dredge and Fill . <br /> The CONTRACTOR shall prepare an Environmental Monitoring Plan including, but not limited to <br /> the specifications provided in Section 13 . 1 of these Technical and Environmental Specifications. <br /> The Monitoring Plan will be discussed at the Pre-Construction Meeting and the COUNTY may, at <br /> their discretion, specify revisions to be incorporated by the CONTRACTOR. The <br /> CONTRACTOR ' S Project Superintendent shall be responsible for the implementation of the <br /> Monitoring Plan and shall attend the Pre-Construction Meeting. Environmental resources within the <br /> project boundaries and those potentially affected outside the work areas of this contract shall be <br /> monitored during conduct of this work. <br /> The CONTRACTOR shall also prepare an Environmental Protection Plan including, but not limited <br /> to the specifications provided in Section 13 .2 of these Technical and Environmental Specifications. <br /> The CONTRACTOR shall confine all construction activities to areas defined in the Construction <br /> Plans and Technical and Environmental Specifications. <br /> 13 . 1 ENVIRONMENTAL MONITORING PLAN <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5. 2007 TS-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.