Laserfiche WebLink
the planting unit success criteria. The replanting of planting units will be the sole <br /> responsibility of the CONTRACTOR and be completed at no cost to the COUNTY . <br /> All warranty and survival provisions and requirements will apply to replanted <br /> planting units. <br /> 43 . 14.5 Initial Planting Unit Survival . Planting units that do not survive for a minimum of <br /> 10 days after installation will be rejected and will not be considered eligible for <br /> payment. New, within-specification, planting units will be installed by the <br /> CONTRACTOR in the areas that do not survive for a minimum of 10 days. <br /> CONTRACTOR will be responsible for installing the new replacement planting units <br /> within 5 days of notification by the COUNTY that an area of initial planting units did <br /> not survive for 10 days. The replacement planting units will be considered eligible <br /> forpayment as "original' planting units only afterthey have survived a minimum of <br /> 10 days from installation . <br /> 43 . 15 Maintenance. The CONTRACTOR shall maintain and irrigate all plantings, starting <br /> at the time of plant installation or relocation, and continuing for 90 calendar days after <br /> the COUNTY has provided written acceptance of the vegetation work. In addition to <br /> irrigation, maintenance shall include all weeding, cultivation, fertilization, spraying, <br /> adjustment of bracing, staking or pruning necessary to keep plants in a healthy and <br /> vigorous growing condition. At the end of the CONTRACTOR'S maintenance period, <br /> the CONTRACTOR shall provide the COUNTY with written instructions as to the <br /> maintenance activities (i .e., irrigation, control of exotic/non-native plants) that will be <br /> required to maintain the plantings in a healthy growing condition. <br /> 43 . 16 Environmental Permits and Turtle Protection. The CONTRACTOR shall comply <br /> with all marine turtle protection requirements as specified by the permits. <br /> 44 . RESTORATION OF ACCESS AND STAGING AREAS <br /> The CONTRACTOR shall submit a Construction Access and Staging Area Restoration <br /> Plan to the COUNTY and ENGINEER for review and approval prior to the Pre- <br /> Construction Meeting. The Plan shall address CONTRACTOR measures to protect <br /> the beach access areas designated in the Contract Drawings, and shall propose the <br /> measure of restoration at each designated access to meet or exceed the lines, grades <br /> and extent of beach/dune vegetation which are in place at the time of <br /> CONTRACTOR mobilization to the Project Site. All provisions in Sections 43 . 1 , <br /> 43 .3, 43 .4 through 43 .9, and 43 . 12 through 43. 16 shall apply to the restoration of the <br /> Construction Access Areas designated in the Contract Drawings. The <br /> CONTRACTOR shall additionally propose measures to limit damage to the <br /> pavement, striping, signage and all improvements present in the Construction Staging <br /> Area designated in the vicinity of R-3 .5 . CONTRACTOR shall restore the pavement <br /> to an equal or better condition upon completion of the work and demobilization of <br /> equipment, facilities, vehicles, and crew from the work area. The CON"TRACTOR <br /> shall photograph and video all roadways to each access location along with the <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5. 2007 TS-48 <br />