My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-192
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:20:57 AM
Creation date
9/30/2015 8:51:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
06/07/2005
Control Number
2005-192
Agenda Item Number
7.X.
Entity Name
St. Johns River Water Management District
Subject
Amendment No.2 to Memorandum of Understanding
Sediment, Flow Reduction , Water Improvements
Agreement January 15, 2002, Amendment No1 February 18,2003
Area
Indian River Lagoon
Supplemental fields
SmeadsoftID
4986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract SF611AA <br /> Amendment #2 <br /> Project Description/ Estimated Timeframes <br /> Project Name Location Tasks Cost Start Complete <br /> Project No. A -2 : Modify the South Relief Canal east of 27th The existing radial arm gate `''E <br /> existing radial arm gate Avenue structure consists of three discrete ' ` <br /> structure at the South Reliefs <br /> radial arm gates . The middle radial <br /> Canal arm gate is set approximately one- <br /> foot below the other two gates and <br /> therefore , also serves as an <br /> overflow weir. When the radial <br /> arm gates are opened , settled solids <br /> immediately upstream of the gate <br /> are re-suspended and discharged <br /> into the Indian River Lagoon . This <br /> project will replace one of the radial <br /> arm gates with a tilting-type weir <br /> gate . Purpose : ( 1 ) to provide more <br /> accurate water level control , (2) to <br /> allow more water to be retained <br /> upstream of the structure , and ( 3 ) to �;,, , <br /> minimize release of settled solids <br /> E <br /> when the water level is lowered . <br /> Design and Permitting $ 165271 5/ 15/2003 complete <br /> Land Acquisition ( 1 ) N/A N/A <br /> k K o 3 ,010/2003 <br /> y C <br /> Construction $ 17 64 78 10/2005 <br /> Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.