My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-301A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-301A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 12:21:13 PM
Creation date
9/30/2015 11:08:12 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M G E <br /> UPS SYSTEMS <br /> Quote ID: CL51339 <br /> Battery Preventive Maintenance Scope of Work <br /> Inspections can be performed on a quarterly, semi-annual or annual basis. The scope of work is defined by the frequency of inspections. MGE <br /> recommends sealed battery inspections semi-annually. <br /> Semi-Annual Inspection or Quarterly Inspections <br /> Check integrity of battery rack or battery cabinet. <br /> Check the general appearance and cleanliness of battery system. <br /> Visually inspect the jars for cracks, leaks, or excessive bulging. <br /> Check for evidence of corrosion at the terminal post and connectors. <br /> Check hardware torque on 10 % of the battery connectors to manufacture specifications. <br /> Measure and record ambient air temperature of battery room. <br /> Using Albercorp cellcorder, or equivalent, test equipment record DC voltage and internal <br /> resistance on entire battery string(s). <br /> Measure and record the system DC float voltage and DC charge current. <br /> Measure and record the AC ripple voltage or AC ripple current. <br /> Provide a report detailing any deficiencies and recommend a corrective action . <br /> Documentation shall provide necessary data for the manufacturer's warranty requirements. <br /> Annual Inspections <br /> Includes all 11 items above. <br /> Re-torque all battery connections to manufacture specifications. <br /> Note 1 : Battery PMs require the unit to be placed in Maintenance Bypass for the duration of the PM. While in Maintenance Bypass your critical load <br /> will be unprotected from any utility power problems. <br /> Note 2: Battery terminal cleaning to correct corrosion and oxidation will be implemented when required. <br /> Note 3: Battery inspections do not include battery replacement. <br /> Note 4: The Albercop cellcorder places a 70 to 75 amp load across each battery and will record both battery float voltage and internal resistance. <br /> These values are used as a predicative tool for early detection of a possible failure when compared to manufacture specifications. <br /> MGE UPS SYSTEMS, INC. 1660 Scenic Avenue, Costa Mesa, California 92626 <br />
The URL can be used to link to this page
Your browser does not support the video tag.