My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. all materials with respect to intended use, incident thereto. The review and approval of a <br /> fabrication, shipping, handling, storage, assem- separate item as such will not indicate approval of <br /> ' bly, and installation pertaining to the perfor- the assembly in which the item functions. <br /> mance of the Work; <br /> 3 . ENGINEER's review and approval of <br /> c. all information relative to means, meth- Shop Drawings or Samples shall not relieve CON- <br /> ods, techniques, sequences, and procedures of TRACTOR from responsibility for any variation <br /> construction and safety precautions and from the requirements of the Contract Documents <br /> programs incident thereto; and unless CONTRACTOR has in writing called <br /> ENGINEER's attention to each such variation at the <br /> d. CONTRACTOR shall also have time of each submittal as required by paragraph <br /> reviewed and coordinated each Shop Drawing or 6. 17.D .3 and ENGINEER has given written <br /> Sample with other Shop Drawings and Samples approval of each such variation by specific written <br /> ' and with the requirements of the Work and the notation thereof incorporated in or accompanying <br /> Contract Documents . the Shop Drawing or Sample approval; nor will any <br /> approval by ENGINEER relieve CONTRACTOR <br /> 2. Each submittal shall bear a stamp or from responsibility for complying with the require- <br /> specific written indication that CONTRACTOR has ments of paragraph 6. 17 .D . 1 . <br /> satisfied CONTRACTOR' s obligations under the <br /> Contract Documents with respect to F. Resubmittal Procedures <br /> CONTRACTOR' s review and approval of that <br /> submittal. 1 . CONTRACTOR shall make corrections <br /> required by ENGINEER and shall return the <br /> 3 . At the time of each submittal, CON- required number of corrected copies of Shop <br /> TRACTOR shall give ENGINEER specific written Drawings and submit as required new Samples for <br /> notice of such variations, if any, that the Shop Draw- review and approval. CONTRACTOR shall direct <br /> ing or Sample submitted may have from the require- specific attention in writing to revisions other than <br /> ments of the Contract Documents, such notice to be the corrections called for by ENGINEER on previ- <br /> in a written communication separate from the ous submittals. <br /> submittal; and, in addition, shall cause a specific <br /> notation to be made on each Shop Drawing and New Paragraph 6.17.G has been added. See <br /> the <br /> Sample submitted to ENGINEER for review and Supplementary Conditions. <br /> approval of each such variation. <br /> 6 . 18 Continuing the Work <br /> E. ENGINEER 'S Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in accordance disagreements with OWNER. No Work shall be delayed or <br /> with the schedule of Shop Drawings and Sample postponed pending resolution of any disputes or <br /> submittals acceptable to ENGINEER, disagreements, except as permitted by paragraph 15 .04 or as <br /> ' ENGINEER's review and approval will be only to OWNER and CONTRACTOR may otherwise agree in <br /> determine if the items covered by the submittals will, writing. <br /> after installation or incorporation in the Work, con- <br /> form to the information given in the Contract Docu- 6. 19 CONTRACTOR 's General Warranty and <br /> ' ments and be compatible with the design concept of Guarantee <br /> the completed Project as a functioning whole as <br /> indicated by the Contract Documents. A. CONTRACTOR warrants and guarantees to <br /> ' OWNER, ENGINEER, and ENGINEER' s Consultants that <br /> 2 . ENGINEER's review and approval will all Work will be in accordance with the Contract Docu- <br /> not extend to means, methods, techniques, ments and will not be defective. CONTRACTOR's <br /> sequences, or procedures of construction (except warranty and guarantee hereunder excludes defects <br /> or <br /> where a particular means, method, technique, damage caused by: <br /> sequence, or procedure of construction is <br /> specifically and expressly called for by the Contract 1 . abuse, modification, or improper main- <br /> Documents) or to safety precautions or programs tenance or operation by persons other than CON- <br /> 00700 - 26 <br /> ON-00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.