4 . 07 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods , techniques , sequences , and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents , that Bidder has <br /> given ENGINEER written notice of all conflicts , errors , ambiguities , and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work . <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> 5 . 01 The date , time , and location for a Pre- Bid conference , if any, are specified in <br /> the <br /> Advertisement for Bids . Representatives of OWNER and ENGINEER will be present to discuss <br /> the Project. Bidders are encouraged to attend and participate in the conference . ENGINEER will <br /> transmit to all prospective Bidders of record such Addenda , as ENGINEER considers necessary <br /> in response to questions arising at the conference . Oral statements may not be relied upon and <br /> will not be binding or legally effective . <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> 6 . 01 The Site is identified in the Bidding Documents . All additional lands and access <br /> ' thereto required for temporary construction facilities , construction equipment , or storage of <br /> materials and equipment to be incorporated in the Work is to be obtained and paid for <br /> by <br /> CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents . <br /> ' ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7 . 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to ENGINEER in writing . Interpretations or clarifications considered necessary by <br /> ENGINEER in response to such questions will be issued by Addenda mailed or delivered to . all <br /> parties through the Issuing Office as having received the Bidding Documents . Questions received <br /> 1 less than ten days prior to the date for opening of Bids may not be answered . Only questions <br /> answered by Addenda will be binding . Oral and other interpretations or clarifications will be <br /> without legal effect. <br /> 7 . 02 Addenda may be issued to clarify, correct, or change the Bidding Documents as <br /> deemed advisable by OWNER or ENGINEER. <br /> 0378-00200 - Instructions to Bidders <br /> 00200 - 4 <br /> F:\Engineering\Capital Projects\0378-26th Street Bridge\0378-26th Street Bridge CONTRACT DOC\0378-00200 - Instructions to Bidders.doc Rev. 05/01 <br />