prior to CONTRACTOR' s purchase thereof for
<br /> 13 . 02 Access to Work incorporation in the Work. Such inspections, tests, or
<br /> approvals shall be performed by organizations acceptable to
<br /> A. OWNER, ENGINEER, ENGINEER' s Con- OWNER and ENGINEER.
<br /> sultants, other representatives and personnel of OWNER,
<br /> independent testing laboratories, and governmental agencies E. If any Work (or the work of others) that is to be
<br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC-
<br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must,
<br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation.
<br /> them proper and safe conditions for such access and advise
<br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph
<br /> programs so that they may comply therewith as applicable. 13 .03 .E shall be at CONTRACTOR' s expense unless CON-
<br /> TRACTOR has given ENGINEER timely notice of
<br /> ' 13 . 03 Tests and Inspections CONTRACTOR's intention to cover the same and ENGI-
<br /> NEER has not acted with reasonable promptness in
<br /> A. CONTRACTOR shall give ENGINEER timely response to such notice.
<br /> ' notice of readiness of the Work for all required inspections,
<br /> tests, or approvals and shall cooperate with inspection and A new Paragraph 13.03.G has been added. See the
<br /> testing personnel to facilitate required inspections or tests. Supplementary Conditions.
<br /> Paragraph 13.03.B has been deleted and replaced with a 13 . 04 Uncovering Work
<br /> new paragraph. See the Supplementary Conditions.
<br /> B Q)A1?hMR shat, o.... ley and pay f. the „F A. If any Work is covered contrary to the written
<br /> ' request of ENGINEER, it must, if requested by ENGI-
<br /> NEER, be uncovered for ENGINEER' s observation and
<br /> eikeept: replaced at CONTRACTOR's expense.
<br /> ' -1 , fer inspeetions, tests, ergs Parts of the last two sentences of paragraph 13.04.B
<br /> eaveFed by paragraphs 13 .0.3 . G. iffind 1. 3 .03 .D ; have been deleted.
<br /> B . If ENGINEER considers it necessary or advisable
<br /> 2 . dh.m. eests i flea i ^ eeti^^ •• rites that covered Work be observed by ENGINEER or inspect-
<br /> ed or tested by others, CONTRACTOR, at ENGINEER's
<br /> 13 .04 .B shaU be paid as pmN4ded in said par-agFap request, shall uncover, expose, or otherwise make available
<br /> 3 . 0 for observation, inspection, or testing as ENGINEER may
<br /> require, that portion of the Work in question, famishing all
<br /> necessary labor, material, and equipment. If it is found that
<br /> GentFaet Documents, such Work is defective, CONTRACTOR shall pay all
<br /> Claims, costs, losses, and damages (including but not
<br /> limited to all fees and charges of engineers, architects,
<br /> Paragraph 13.03.0 has been deleted in its entirety. attorneys, and other professionals and all court or arbitration
<br /> G. if Laws er- Regulaiens of any publie body having or other dispute resolution costs) arising out of or relating to
<br /> ,, ,,.:.a:,.«: ,.., _e e any Werk nor ,.a# «w feet) s ,.: a, .,n. , such uncovering, exposure, observation, inspection,
<br /> and
<br /> to we : eeted testea of approved by a e•r..leyee er. ,,.we. testing, and of satisfactory replacement or reconstruction
<br /> «..«:. ,e „r .,..,.w ... .wi: w a. . �n�rrn n r-rnv �w n
<br /> (including but not limited to all costs of repair or
<br /> replacement of work of others) ; and OWNER shall be
<br /> entitled to an appropriate decrease in the Contract Price. If
<br /> the parties are unable to agree as to the amount thereof,
<br /> OWNER may make a Claim therefor as provided in
<br /> paragraph 10.05 . If, however, such Work is not found to be
<br /> D . CONTRACTOR shall be responsible for defective, CONTRACTOR shall be allowed
<br /> arranging and obtaining and shall pay all costs in connection *we r^-•' .aet Pdoeor- an extension of the Contract Times (or
<br /> with any inspections, tests, or approvals required for Milestones), of beth-, directly attributable to such
<br /> OWNER' s and ENGINEER' s acceptance of materials or uncovering, exposure, observation, inspection, testing,
<br /> equipment to be incorporated in the Work; or acceptance of replacement, and reconstruction. If the parties are unable to
<br /> ' materials, mix designs, or equipment submitted for approval
<br /> ' 00700 - 37