My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' detem3i.,ed to be due, theft CONTRACTOR may, upon the first and include the last day of such period. If <br />the last <br /> seven days written notice to OWNER and ENGINEER, and day of any such period falls on a Saturday or Sunday or on a <br /> provided OWNER or ENGINEER do not remedy such day made a legal holiday by the law of the applicable <br /> suspension or failure within that time, terminate the jurisdiction, such day will be omitted from the computation. <br /> Contract and recover from OWNER payment on the same <br /> terms as provided in paragraph 15 .03 . In lieu of terminating 17 .03 Cumulative Remedies <br /> the Contract and without prejudice to any other right or <br /> remedy, if ENGINEER has failed to act on an Application A. The duties and obligations imposed by these <br /> for Payment within 30 days after it is submitted, eF General Conditions and the rights and <br />remedies available <br /> QMZNEn has failed f r 30 days to pay (mi =re n rrnn any hereunder to the parties hereto are in addition to, and are not <br /> sum fully Bete....., ed to be due, CONTRACTOR may, to be construed in any way as a limitation of, any rights and <br /> seven days after written notice to OWNER and remedies available to any or all of them which are otherwise <br /> ENGINEER, stop the Work until payment is made of all imposed or available by Laws or Regulations, by special <br /> such amounts due CONTRACTOR, including interest warranty or guarantee, or by other provisions of <br /> the <br /> thereon. The provisions of this paragraph 15 .04 are not Contract Documents, and the provisions of this paragraph <br /> intended to preclude CONTRACTOR from making a Claim will be as effective as if repeated specifically in the Contract <br /> under paragraph 10.05 for an adjustment in Contract Price Documents in connection with each particular duty, <br /> or Contract Times or otherwise for expenses or damage obligation, right, and remedy to which they apply. <br /> directly attributable to CONTRACTOR' s stopping the <br /> Work as permitted by this paragraph. 17 .04 Survival of Obligations <br /> A. All representations, indemnifications, warranties, <br /> ARTICLE 16 - DISPUTE RESOLUTION and guarantees made in, required by, or given in accordance <br /> with the Contract Documents, as well as all continuing <br /> obligations indicated in the Contract Documents, will <br /> 16.01 Methods and Procedures survive final payment, completion, and acceptance of the <br /> Work or termination or completion of the Agreement. <br /> Paragraph 16.01 .A has been deleted and replaced with a <br /> new paragraph. See the Supplementary Conditions. 17 . 05 Controlling Law <br /> A. Dispute Feseltifien methods and , if any, Paragraph 17.05.A has been deleted and replaced with a <br /> shall be as set fefth in the SupplementaFy Gen"ens. If ne new paragraph. See the Supplementary Conditions. <br /> preN4siens of paFagr-aphs 9 .09 and , heti. <br /> statein . . the Ure ee4 is leeated. <br /> CM]. 1 PD A (;TQD meiEer-eise .eh rights er remedies as <br /> New Paragraphs have been added. See the Supplementary <br /> by Laws r Regulations i.. r-espeet of any aisptAe Conditions. <br /> ARTICLE 17 - MISCELLANEOUS <br /> ' 17 .01 Giving Notice <br /> A. Whenever any provision of the Contract <br /> Documents requires the giving of written notice, it will be <br /> deemed to have been validly given if delivered in person to <br /> the individual or to a member of the firm or to an officer of <br /> ' the corporation for whom it is intended, or if delivered at or <br /> sent by registered or certified mail, postage prepaid, to the <br /> last business address known to the giver of the notice. <br /> 17 .02 Computation of Times <br /> A. When any period of time is referred to in the <br /> ' Contract Documents by days, it will be computed to exclude <br /> 00700 - 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.