My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement ( Public Works ) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , (hereinafter called <br /> OWNER) <br /> ' and SHELTRA AND SONS CONSTRUCTION CO . , INC . (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> ' agree as follows : <br /> ARTICLE 1 - WORK <br /> ' 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents , The Work is generally described as follows : <br /> This project includes the construction of a three-lane bridge <br /> ( Precast Concrete Three Sided Box Culvert) approximately 800 LF <br /> of 2-3 lane asphalt roadway, storm drainage system and other <br /> related items required for construction . Also , the project includes <br /> closing 26th Street during the construction of the proposed bridge <br /> and maintenance of traffic during construction . <br /> ARTICLE 2 - THE PROJECT <br /> ' 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> ' Project Name : 26th Street Bridge Replacement <br /> County Project Number: 0378 <br /> Project Address : 26 thStreet from 74th Avenue to approximately <br /> 800 feet east of 74 Avenue <br /> ARTICLE 3 — ENGINEER <br /> ' 3 . 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER 's representative , assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents . <br /> ARTICLE 4 - CONTRACT TIMES <br /> ' 4 . 01 Time of the Essence <br /> ' A . All time limits for Milestones , if any, Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> ' 0378-00520 - Agreement (Public Works).doc <br /> 00520 - 2 <br /> FAEngineering\Capital Projects\0378-26th Street Bridge\0378-26th Street Bridge CONTRACT DOC\0378-00520 - Agreement (Public Works).doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.