Laserfiche WebLink
1 <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified in the Supplementary <br /> ' Conditions as provided in paragraph 4 . 02 of the General Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> ' done so) all examinations , investigations , explorations , tests , studies , and data concerning <br /> conditions (surface , subsurface , and Underground Facilities) at or contiguous to the Site <br /> which may affect cost, progress , or performance of the Work or which relate to any aspect <br /> ' of the means , methods , techniques , sequences , and procedures of construction to be <br /> employed by CONTRACTOR, including applying the specific means , methods , <br /> techniques , sequences , and procedures of construction , if any , expressly required by the <br /> Contract Documents to be employed by CONTRACTOR , and safety precautions and <br /> programs incident thereto <br /> F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents , <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents , <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> Contract Documents , and all additional examinations , investigations , explorations , tests , <br /> studies , and data with the Contract Documents , <br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the <br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR . <br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of <br /> all terms and conditions for performance and furnishing of the Work . <br /> ARTICLE 9 - CONTRACT DOCUMENTS <br /> 9 . 01 Contents <br /> A. The Contract Documents consist of the following : <br /> 1 . This Agreement (pages 00520- 1 to 00520-8 inclusive ) ; <br /> ' 2 . Performance Bond ( pages 00610- 1 to 00610- 5 , inclusive) ; <br /> 3 . Payment Bond ( pages 00612- 1 to 00612-5 , inclusive ) ; <br /> ' 4 . General Conditions ( pages 00700- 1 to 00700-45 , inclusive ) ; <br /> 5 . Supplementary Conditions ( pages 00800- 1to 00800- 13 inclusive ) ; <br /> 6 . Specifications as listed in the table of contents of the Project Manual ; <br /> 0378-00520 - Agreement (Public Works ).doc <br /> 00520 - 5 <br /> FAEngineering\Capital Projects\0378-26th Street Bridge\0378-26th Street Bridge CONTRACT DOC\0378.00520 - Agreement (Public Works).doc Rev. 05/01 <br />