My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> ' NOTE : SOME OF THE GENERAL CONDITIONS HAVE BEEN MODIFIED BY THE SUPPLEMENTARY <br /> CONDITIONS . IN THESE INSTANCES, THE SECTIONS OF THE GENERAL CONDITIONS SO MODIFIED <br /> HAVE BEEN DENOTED HEREIN FOR THE CONTRACTOR' S CONVENIENCE. REFER TO THE <br /> SUPPLEMENTARY CONDITIONS FOR THE MODIFIED LANGUAGE. <br /> ' ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 7. Bidding Requirements--The Advertisement or <br /> Invitation to Bid, Instructions to Bidders, Bid security form, <br /> if any, and the Bid form with any supplements . <br /> ' 1 . 01 Defined Terms <br /> 8 . Bonds—Performance and payment bonds and <br /> A. Wherever used in the Contract Documents and other instruments of security. <br /> printed with initial or all capital letters, the terms listed <br /> ' below will have the meanings indicated which are 9 . Change Order--A document recommended by <br /> applicable to both the singular and plural thereof. ENGINEER which is signed by CONTRACTOR and <br /> OWNER and authorizes an addition, deletion, or revision in <br /> 1 . Addenda--Written or graphic instruments the Work or an adjustment in the Contract Price or the <br /> issued prior to the opening of Bids which clarify, correct, or Contract Times, issued on or after the Effective Date of the <br /> change the Bidding Requirements or the Contract Agreement. <br /> Documents. <br /> 10. Claim—A demand or assertion by OWNER or <br /> 2 . Agreement—The written instrument which is CONTRACTOR seeking an adjustment of Contract Price or <br /> evidence of the agreement between OWNER and Contract Times, or both, or other relief with respect to the <br /> ' CONTRACTOR covering the Work. terms of the Contract. A demand for money or services by a <br /> third party is not a Claim <br /> 3 . Application for Payment--The form <br /> acceptable to ENGINEER which is to be used by CON- 11 . Contract--The entire and integrated written <br /> TRACTOR during the course of the Work in requesting agreement between the OWNER and CONTRACTOR <br /> progress or final payments and which is to be accompanied concerning the Work. The Contract supersedes prior <br /> by such supporting documentation as is required by the negotiations, representations, or agreements, whether <br /> ' Contract Documents, written or oral. <br /> 4. Asbestos—Any material that contains more 12 . Contract Documents--The Contract Docu- <br /> ' than one percent asbestos and is friable or is releasing ments establish the rights and obligations of the parties <br /> and <br /> asbestos fibers into the air above current action levels include the Agreement, Addenda (which pertain to the <br /> Con- <br /> established by the United States Occupational Safety and tract Documents), CONTRACTOR' s Bid (including docu- <br /> Health Administration. mentation accompanying the Bid and any post Bid <br /> ' documentation submitted prior to the Notice of Award) . <br /> 5 . Bid—The offer or proposal of a bidder submit- when attached as an exhibit to the Agreement, the Notice to <br /> ted on the prescribed form setting forth the prices for the Proceed, the Bonds, these General Conditions, the <br /> Work to be performed. Supplementary Conditions, the Specifications and the <br /> Drawings as the same are more specifically identified in the <br /> 6. Bidding Documents--The Bidding Agreement, together with all Written Amendments, Change <br /> Requirements and the proposed Contract Documents (in- Orders, Work Change Directives, Field Orders, and <br /> cluding all Addenda issued prior to receipt of Bids) . ENGINEER's written interpretations and clarifications <br /> issued on or after the Effective Date of the Agreement. <br /> Approved Shop Drawings and the reports and drawings of <br /> ' subsurface and physical conditions are not Contract <br /> 00700-6 <br /> ' Standard General Conditions of the Construction Contract PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.