My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Agreement. In no event will the Contract Times commence <br /> to run later than the sixtieth day after the day of Bid opening Paragraph 2 .05.0 has been deleted and replaced with a <br /> ' or the thirtieth day after the Effective Date of the new paragraph. See the Supplementary Conditions. <br /> Agreement, whichever date is earlier. G. Bio•ideuee-ef hnee=Be€em any x efk at the. <br /> Site is staitea GQNgq? n GTQ and Q;Wn x:n sha]4 each <br /> 2 . 04 Starting the Work , <br /> ' A. CONTRACTOR shall start to perform the Work <br /> on the date when the Contract Times commence to run. No them or any additional insuEed n3ay reasonably r-equeso, <br /> ' Work shall be done at the Site prior to the date on which the whieh GQ, 9RAGTOR "..a respeetvely are <br /> Contract Times commence to run. <br /> Ailiele-5 <br /> 2 . 05 Before Starting Construction <br /> ' Paragraph 2.06.A has been deleted and replaced with a <br /> A. CONTRACTOR 's Review of Contract Documents: new paragraph. See the Supplementary Conditions. <br /> Before undertaking each part of the Work, 2 .06 Preconstruction Conference <br /> ' CONTRACTOR shall carefizlly study and compare the <br /> Contract Documents and check and verify pertinent figures Al W ' i^ 20 days ^ ft" the Geeta.. Tiaws ^«^..« to <br /> therein and all applicable field measurements. „ •n but be f any Wer _ at « e Site ; st. .ed, a <br /> eiif e e <br /> CONTRACTOR shall promptly report in writing to ^ «*^^a ^ a - rr,T.rrowr-Tnn �T.TnnrG� <br /> '- v and .«t,e, ^ as <br /> ENGINEER any conflict, error, ambiguity, or discrepancy appropriate sviH be held. toestnbfish a WeEking <br /> which CONTRACTOR may discover and shall obtain a tmder-standing ameng the paFties ,as-tethe -War-k and to <br /> written interpretation or clarification from ENGINEER diseusst.hesEhedules referred-to in paragWh 2 .05 .B-, <br /> before proceeding with any Work affected thereby; preeedufes—fer- -handling—£hep DmvAngs and effiff <br /> however, CONTRACTOR shall not be liable to OWNER submittals, prosessingApplications--for- Payment, and. <br /> or ENGINEER for failure to report any conflict, error, <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known 2 . 07 Initial Acceptance of Schedules <br /> thereof. <br /> A. Unless otherwise provided in the Contract Docu- <br /> ' B . Preliminary Schedules: Within ten days after the ments, at least ten days before submission of the <br /> first <br /> Effective Date of the Agreement (unless otherwise specified Application for Payment a conference attended by CON- <br /> in the General Requirements), CONTRACTOR shall TRACTOR, ENGINEER, and others as appropriate will be <br /> submit to ENGINEER for its timely review: held to review for acceptability to ENGINEER as provided <br /> below the schedules submitted in accordance with <br /> 1 . a preliminary progress schedule indicat- paragraph 2 .05 .B . CONTRACTOR shall have an <br /> ing the times (numbers of days or dates) for starting additional ten days to make corrections and adjustments and <br /> and completing the various stages of the Work, to complete and resubmit the schedules. No <br />progress <br /> including any Milestones specified in the Contract payment shall be made to CONTRACTOR until acceptable <br /> Documents; schedules are submitted to ENGINEER. <br /> ' 2, a preliminary schedule of Shop Drawing 1 . The progress schedule will be acceptable <br /> and Sample submittals which will list each required to ENGINEER if it provides an orderly progression <br /> submittal and the times for submitting, reviewing, of the Work to completion within any specified <br /> ' and processing such submittal; and Milestones and the Contract Times. Such accep- <br /> tance will not impose on ENGINEER responsibility <br /> 3 , a preliminary schedule of values for all of for the progress schedule, for sequencing, schedul- <br /> ' the Work which includes quantities and . prices of ing, or progress of the Work nor interfere with or <br /> items which when added together equal the Contract relieve CONTRACTOR from CONTRACTOR' s <br /> Price and subdivides the Work into component parts full responsibility therefor. <br /> ' in sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such 2 . CONTRACTOR's schedule of Shop <br /> prices will include an appropriate amount of Drawing and Sample submittals will be acceptable <br /> overhead and profit applicable to each item of to ENGINEER if it provides a workable <br /> ' Work. <br /> t00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.