My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-310
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:40:48 PM
Creation date
9/30/2015 7:04:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-310
Agenda Item Number
7.U.
Entity Name
Sheltra & Son Construction
Subject
26th St. Bridge Replacement Contract and Specifications
Area
26th St.
Project Number
0378
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3502
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tCONTRACTOR on or in connection with any other CONTRACTOR shall be responsible for the safety <br /> project or anticipated project. and protection of such Underground Facility. <br /> ' 4 .04 Underground Facilities 2 , If ENGINEER concludes that a change in <br /> the Contract Documents is required, a Work Change <br /> A. Shown or Indicated: The information and data Directive or a Change Order will be issued to reflect <br /> ' shown or indicated in the Contract Documents with respect and document such consequences. An equitable <br /> to existing Underground Facilities at or contiguous to the adjustment shall be made in the Contract Price or <br /> Site is based on information and data furnished to OWNER Contract Times, or both, to the extent that they are <br /> ' or ENGINEER by the owners of such Underground Facili- attributable to the existence or location of <br /> any <br /> ties, including OWNER, or by others . Unless it is otherwise Underground Facility that was not shown or <br /> expressly provided in the Supplementary Conditions : indicated or not shown or indicated with reasonable <br /> accuracy in the Contract Documents and that <br /> ' 1 . OWNER and ENGINEER shall not be CONTRACTOR did not know of and could not <br /> responsible for the accuracy or completeness of any reasonably have been expected to be aware of or to <br /> such information or data; and have anticipated. If OWNER and CONTRACTOR <br /> are unable to agree on entitlement to or on the <br /> 2. the cost of all of the following will be amount or extent, if any, of any such adjustment in <br /> included in the Contract Price, and CONTRACTOR Contract Price or Contract Times, OWNER or <br /> shall have full responsibility for: CONTRACTOR may make a Claim therefor as <br /> provided in paragraph 10.05 , <br /> a. reviewing and checking all such informa- <br /> tion and data, 4 . 05 Reference Points <br /> b. locating all Underground Facilities A. OWNER shall provide engineering surveys to <br /> shown or indicated in the Contract Documents, establish reference points for construction which in <br /> ENGINEER' s judgment are necessary to enable CON- <br /> c. coordination of the Work with the TRACTOR to proceed with the Work. CONTRACTOR <br /> owners of such Underground Facilities, shall be responsible for laying out the Work, shall protect <br /> including OWNER, during construction, and and preserve the established reference points and property <br /> monuments, and shall make no changes or relocations <br /> d. the safety and protection of all such without the prior written approval of OWNER. <br /> Underground Facilities and repairing any CONTRACTOR shall report to ENGINEER whenever any <br /> damage thereto resulting from the Work. reference point or property monument is lost or destroyed or <br /> requires relocation because of necessary changes in grades <br /> B . Not Shown or Indicated or locations, and shall be responsible for the accurate <br /> replacement or relocation of such reference points or <br /> ' 1 . If an Underground Facility is uncovered property monuments by professionally qualified personnel. <br /> or revealed at or contiguous to the Site which was <br /> not shown or indicated, or not shown or indicated 4 .06 Hazardous Environmental Condition at Site <br /> ' with reasonable accuracy in the Contract <br /> Documents, CONTRACTOR shall, promptly after A. Reports and Drawings: Reference is made to the <br /> becoming aware thereof and before further Supplementary Conditions for the identification of those <br /> disturbing conditions affected thereby or performing reports and drawings relating to a Hazardous Environmental <br /> ' any Work in connection therewith (except in an Condition identified at the Site, if any, that <br /> have been <br /> emergency as required by paragraph 6 . 16.A), utilized by the ENGINEER in the preparation of the <br /> identify the owner of such Underground Facility and Contract Documents. <br /> ' give written notice to that owner and to OWNER <br /> and ENGINEER. ENGINEER will promptly review B . Limited Reliance by CONTRACTOR on Technical <br /> the Underground Facility and determine the extent, Data Authorized: CONTRACTOR may rely upon the <br /> ' if any, to which a change is required in the Contract general accuracy of the "technical data" contained in such <br /> Documents to reflect and document the reports and drawings, but such reports and drawings are not <br /> consequences of the existence or location of the Contract Documents. Such "technical data" is identified in <br /> Underground Facility. During such time, the Supplementary Conditions. Except for such reliance on <br /> ' such "technical data," CONTRACTOR may not rely upon <br /> 00700 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.