My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-354A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-354A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:40:31 PM
Creation date
10/1/2015 12:50:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-354A
Agenda Item Number
8.V.
Entity Name
Sheltra & Son Construction
Subject
12th. St. sidewalk
Area
43rd Ave. to 27th Ave.
Project Number
0604
Bid Number
2008080
Supplemental fields
SmeadsoftID
7696
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 = Work Change Directive <br />No. <br />EFFECTIVE DATE: <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Bid <br />Proj <br />OWNER's Contract No. 2008080 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0604 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />F Unit Prices <br />II Lump Sum <br />❑ Other: <br />Q By Change Order: <br />Estimated increase (decrease) in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />RECOMMENDED: <br />By: <br />ENGINEER (Authorized Signature) <br />Date: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />❑ Engineer's Records <br />0 Other: <br />171 By Change Order: <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />AUTHORIZED: <br />By: <br />OWNER (Authorized Signature <br />Date: <br />* * END OF SECTION * * <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\Bid Documents\00948 - Work <br />Change Directive.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.