Laserfiche WebLink
SECTION 00948 = Work Change Directive <br />No. <br />EFFECTIVE DATE: <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Bid <br />Proj <br />OWNER's Contract No. 2008080 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0604 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />F Unit Prices <br />II Lump Sum <br />❑ Other: <br />Q By Change Order: <br />Estimated increase (decrease) in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />RECOMMENDED: <br />By: <br />ENGINEER (Authorized Signature) <br />Date: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />❑ Engineer's Records <br />0 Other: <br />171 By Change Order: <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />AUTHORIZED: <br />By: <br />OWNER (Authorized Signature <br />Date: <br />* * END OF SECTION * * <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\Bid Documents\00948 - Work <br />Change Directive.doc <br />