Laserfiche WebLink
SECTION 00575 SODDING <br />A. Description: Sod for the project shall be of the variety that is common to the area <br />and of a variety approved by the Engineer. This work shall also include mowing in <br />accordance with Section 104-7.2, to be mowed at 6" height with a mulching <br />mower. <br />6. Work Included: Scope of Work: The work specified in this section consists of the <br />establishing of a stand of grass, within the project, right-of-way, easements, and <br />other areas indicated on the Drawings, by furnishing and placing grass sod. Also <br />included are fertilizing, watering and maintenance as required to assure a healthy <br />stand of grass. Two applications of fertilizer will be required with the initial <br />application being fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for three months after date of <br />final acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do <br />not exhibit the characteristics to meet specifications, shall be replaced within two <br />weeks of notice from Owner or Engineer. All replacement sod shall be <br />furnished/installed at no additional cost to the Owner and shall be guaranteed for <br />three months. All replacement shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is <br />received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth <br />shall be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws. <br />The numerical designations for fertilizer indicate the minimum percentages <br />(respectively) of (1) total nitrogen, (2) available phosphoric acid and (3) <br />water-soluble potash contained in the fertilizer. <br />The chemical designation of the fertilizer shall be 164-8. Fertilizer shall include <br />iron, minor nutrients and trace elements. At least 50 percent of the nitrogen shall <br />be derived from organic sources. At least 50 percent of the phosphoric acid shall <br />be from normal super phosphate or an equivalent source which will provide a <br />minimum of two units of sulfur. The amount of sulfur shall be indicated on the <br />quantitative analysis card attached to each bag or other container. <br />Contractor shall ensure 1 pound of nitrogen per 1,000 square feet. <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-5 and 2.34.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. <br />Where the soil is sufficiently loose and clean, the Owner, at his discretion, may <br />authorize the elimination of ground preparation. <br />GENERAL PROVISIONS <br />01025-13 <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\Bid Documents\DIVISION 2 - Technical <br />Provisions.doc <br />