My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-354B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-354B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:15:07 AM
Creation date
10/1/2015 12:50:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-354B
Agenda Item Number
8.V.
Entity Name
Sheltra & Son Contracting
Subject
12th. St. sidewalk
Area
43rd. Avenue to 27th Ave.
Project Number
0604
Bid Number
2008080
Supplemental fields
SmeadsoftID
7697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
notify the District staff that the system is ready for inspection and approval . <br /> 9 , if the permitted system was not designed by a registered professional , within 30 days after <br /> completion of the stormwater system , the permittee must submit to the District the following : <br /> District Form No . 40C- 1 . 181 (14) (As built Certification ) , signed by the permittee and two ( 2 ) <br /> sets of "As Built" drawings when required by a special condition of this permit, or when .the <br /> completed system substantially differs from permitted plans . This submittal will serve to <br /> notify the District staff that the system is ready for inspection and approval . <br /> 10 . Stabilization measures shall be initiated for erosion and sediment control on disturbed areas <br /> as soon as practicable in portions of the site where construction activities have temporarily <br /> or permanently ceased , but in no case more than seven ( 7) days before the construction <br /> activity in that portion of the site has temporarily or permanently ceased . <br /> 11 . Should any other regulatory agency require changes to the permitted system , the permittee <br /> shall provide written notification to the District of the Changes prior to implementation so that <br /> a determination can be made whether a permit modification is required . <br /> 12 . Within thirty ( 30 ) days after sale or conveyance of the permitted stormwater management <br /> system or the real property on which the system is located , the owner in whose name the <br /> permit was granted shall notify the District of such change of ownership . Transfer of the <br /> permit shall be in accordance with the provisions of section 40C-612 , F . A.C. All terms and <br /> conditions of this permit shall be binding upon the transferee . The permittee transferring the <br /> permit shall remain liable for any corrective actions that may be required as a result of any <br /> permit violations prior to such sale , conveyance or other transfer. <br /> 13 . The stormwater management system must be completed in accordance with the permitted <br /> plans and permit conditions prior to the initiation of the permitted use of site infrastructure . <br /> The system must be completed in accordance with the permitted plans and permit <br /> conditions prior. to transfer of responsibility for operation and maintenance of the stormwater <br /> management system to a local government or other responsible entity. <br /> 14 . The operation phase of the permit shall not become effective until the requirements of <br /> Condition No . 8 or 9 have been met, the district determines that the system complies with <br /> the permitted plans , and the entity approved by the District in accordance with section 40C- <br /> 42 : 027 , F .A. C . , accepts responsibility for operation and maintenance of the system . The <br /> permit cannot be transferred to such an approved , responsible operation and maintenance <br /> entity until the requirements of section 40C-42 . 028 , F . A. C . , are met, and the operation <br /> phase of the permit becomes effective . Following inspection and approval of the permitted <br /> system by the District in accordance with section 40C-42 . 028 , F . A. C . , the permittee shall <br /> request transfer of the permit to the responsible approved operation and maintenance entity, <br /> if different from the permittee . Until the permit is transferred pursuant to subsection 40C- <br /> 42 . 028 (4) F .A. C. , the permittee shall be liable for compliance with the terms of the permit. <br /> 15 . Prior to lot or unit sales , or upon completion of construction of the system , whichever occurs <br /> first, the District must receive the final operation and maintenance document(s) approved by <br /> the District and recorded , if the latter is appropriate . For those systems which are proposed <br /> to be maintained by county or municipal entities , final operation and maintenance <br /> documents must be received by the District when maintenance and operation of the system <br /> is accepted by the local government entity, Failure to submit the appropriate final document <br /> will result in the permittee remaining personally liable for carrying out maintenance and <br /> operation of the permitted system . <br /> 16 . This permit does not eliminate the necessity to obtain any required federal , state , local and <br /> special district authorizations prior to the start of any activity approved by this permit. This <br /> permit does not convey to the permittee or create in the permittee any property right, or any <br />
The URL can be used to link to this page
Your browser does not support the video tag.