Laserfiche WebLink
If substantial completion is not obtained at the inspection called by Contractor, for reasons which are <br />the fault of Contractor, any additional cost to Owner for the Engineer or design professional for any <br />subsequent inspections for the purpose of determining substantial completion shall be the responsibility of the <br />Contractor and shall be assessed against the final payment application. <br />GC 41 FINAL INSPECTION AND ACCEPTANCE <br />The following items shall be completed as a condition precedent to a request by Contractor for final <br />inspection: <br />1. Completion of all punch list items recorded from the substantial completion inspection. <br />2. A complete set of mylar or paper marked -up as-builts with "RECORD" or "AS BUILT" clearly <br />printed on each sheet along with one copy on AutoCAD CD Release 14 or better on State Plane Coordinates. <br />Contractor shall accurately and neatly transfer all deviations from progress as-builts to final as-builts. As -built <br />records shall include drawings signed and sealed by a registered land surveyor certifying the elevation and <br />location of improvements. Certified drawings are to show locations, lines and grade of buried pipe line four (4) <br />inches or larger in diameter and exterior to buildings, and other buried facilities (e.g, valves, tanks, vaults, <br />storm inlets, ducts, etc.) installed or discovered as a result of the work. Certified drawings are to show building <br />corners, sidewalks, paved areas and the location of all above ground structures within the project site. <br />Contractor shall sign each final record drawing and note thereon that the final as-builts are complete and <br />accurate. <br />3. A complete set of marked -up specifications with "RECORD" or "AS -BUILT' clearly printed on <br />the cover. Contractor shall accurately and neatly transfer all deviations from progress specifications to final <br />as-builts. <br />4. A signed and notarized affidavit indicating that no asbestos containing materials were used or <br />installed during the course of the work. <br />5. A list of each piece of equipment having an individual value of $500 or greater. The list shall <br />include, at a minimum, the name, make and model number, quantity installed, value of equipment. <br />Contractor shall inform Owner in writing that work is ready for final inspection. The Engineer will, <br />within five (5) business days, make such inspection. When Engineer finds the work acceptable under the <br />Contract and all contract terms and conditions fully performed, Engineer shall issue a Final Certification to <br />Owner. <br />GC 42 EXTENSION OF TIME. <br />The time limit for the completion of the work as described in the Contract is of the essence of this <br />Contract. Contractor must request an extension of the contract completion date in writing and must provide <br />the following information within seven (7) days of commencement of the delay. Contractor acknowledges that <br />the evaluation of time extensions will be based on the following information: <br />1. All schedule updates, submittals and other conditions of the Contract have been met; <br />2. The delay is beyond the control of the Contractor and subcontractors and due to no <br />direct or indirect fault of the Contractor. <br />3. Nature of the delay. <br />4. Dates of commencement / and end of delay. <br />5. Evidence that the delayed work results in a direct delay to the schedule critical path. <br />6. List of tasks/work affected by the delay. <br />7. Anticipated extent of delay. <br />8. Recommended action to minimize delay. <br />9. The Contractor has used all the float time available for the work involved in the delay <br />request. <br />Time extensions for weather delays will only be considered if all float time is exhausted prior to the weather <br />occurrence. Failure of Contractor to timely request a time extension constitutes a waiver by Contractor and a <br />denial of a time extension. <br />If the Contractor is delayed at any time in the progress of the work by any act or neglect of the Owner, or if any <br />employee of the Owner or by any separate Contractor employed by the Owner or by any changes ordered in <br />40 <br />F:\Engineering\Capital Projects\0604-12th St Sidewalk Improve between 43rd Ave & 27th Ave\0604 Federal <br />Contract Provisions.doc arzs MM 320:34 PM <br />