My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-354C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-354C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:17:15 AM
Creation date
10/1/2015 1:01:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-354C
Agenda Item Number
8.V.
Entity Name
Sheltra & Son Construction
Subject
12th. St. sidewalk
Area
43rd. Ave. to 27th. Ave.
Project Number
0604
Bid Number
2008080
Supplemental fields
SmeadsoftID
8041
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deliver all such papers and take all such steps including the legal assignment of his contractual rights , as the <br /> Owner may require for the purpose of fully vesting in him the rights and benefits of the Contractor under such <br /> obligations or commitments . <br /> GC 53 REMOVAL OF EQUIPMENT . <br /> In the case of termination of this Contract before completion , from any cause whatsoever, the <br /> Contractor, if notified to do so by the Owner, shall promptly remove any part or all of its equipment and <br /> supplies from the property of the Owner, failing which the Owner shall have the right to remove such <br /> equipment and supplies at the expense of the Contractor. <br /> GC 54 WARRANTY . <br /> Contractor shall warrant that all materials and equipment included in such Work will be new except <br /> where indicated otherwise in Contract Documents , and that such work will be of good quality, free from <br /> improper workmanship and defective materials and in conformance with the drawings and specifications . <br /> Contractor warrants all equipment, materials and labor furnished under this Contract against defect in design , <br /> materials and workmanship for a period of twelve ( 12 ) months from Final Payment, unless longer warranties <br /> are provided in the Contract Documents in which case the longer period prevails . The Contractor shall collect <br /> and deliver to the Owner any specific written warranties given by others as required by the Contract <br /> Documents . Notwithstanding any provisions in the Contract Documents to the contrary, this express warranty <br /> shall commence on the date the Owner obtains the final certificate of occupancy for the Project (or <br /> equivalent) . The Contractor shall conduct, jointly with the Owner, a warranty inspection nine (9 ) months after <br /> the date of Final Completion . Upon receipt of Notice from the Owner of failure of any part of the guaranteed <br /> equipment or materials during the guarantee period , the defective parts or materials shall be replaced <br /> promptly with new parts or materials by the Contractor, at no expense to the Owner. <br /> GC 55 ROYALTIES AND PATENTS . <br /> The Contractor shall pay for all royalties and license fees . Contractor indemnifies and shall defend <br /> and hold Owner and its representatives harmless from and against all claims , losses , costs , damages and <br /> expenses , including attorney fees in connection with any claims or actions based upon infringement of any <br /> patent arising out of the use of any materials or equipment or processes furnished or employed by Contractor <br /> under the Contract . The Owner shall be responsible for all such loss when a particular process or the product <br /> of a particular manufacturer, or manufacturers , is specified ; but if the Contractor has information that the <br /> process or article specified is an infringement of a patent, he shall be responsible for such loss unless he <br /> promptly gives such information to the Engineer. <br /> GC 56 VERBAL AGREEMENTS . <br /> No verbal agreement or conversation with any officer, agent or employee of the Owner either before <br /> or after execution of this Contract shall affect or modify any of the terms or obligations contained in any of the <br /> documents comprising said Contract. All contract amendments or change orders shall be written and <br /> executed by both Owner and Contractor. <br /> GC 57 MISCELLANEOUS TERMS , <br /> GC 57 . 1 Headings . The headings contained in these General Terms and Conditions are <br /> provided for convenience only. <br /> GC 57 .2 Integration . This Contract constitutes the entire agreement between Contractor and <br /> the Owner and supersedes all prior verbal and written agreements , understandings , negotiations and <br /> discussions between the parties hereto . The Invitation to Bid and its terms and conditions are <br /> incorporated herein and made a part of this Contract. No verbal agreement or conversation with any <br /> officer, agent or employee of the Owner either before or after execution of the Contract shall affect or <br /> modify any of the terms or obligations contained in any of the documents comprising said Contract . <br /> GC 57 . 3 Severability. The invalidity, illegality or unenforceability of any provision of the <br /> Contract shall not affect the validity, legality or enforceability or any other provision of the Contract and <br /> the Contract shall be construed and enforced in all respects as if the invalid , illegal or unenforceable <br /> 46 <br /> F :\Engineering\Capital Projects\0604- 12th St Sidewalk Improve between 43rd Ave & 27th Ave\0604 Federal <br /> Contract Provisions .doc M2" 3.20:34 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.