My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-354C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-354C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:17:15 AM
Creation date
10/1/2015 1:01:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-354C
Agenda Item Number
8.V.
Entity Name
Sheltra & Son Construction
Subject
12th. St. sidewalk
Area
43rd. Ave. to 27th. Ave.
Project Number
0604
Bid Number
2008080
Supplemental fields
SmeadsoftID
8041
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 . PRE -BID SITE INSPECTION AND PRE -BID CONFERENCE <br /> SITE INSPECTION - NONE <br /> PRE-BID CONFERENCE - NONE <br /> 21 . TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> BASE BID — TIMEFRAME <br /> The work to be performed as part of the BASE BID project timeframe shall commence on the date of <br /> the written notice to proceed given by the County, which is anticipated to be issued on April 3 , 2006 . <br /> All work that is to be performed as part of this contract shall be substantially completed by <br /> November 30 , 2006 and totally 100 % completed by December 31 , 2006 , with such extensions of <br /> time in calendar days as are provided for in the General Terms and Conditions outlined below. <br /> If said work is not substantially completed within the specified timeframes listed above , the <br /> contractor shall be liable and hereby agrees to pay the owner as liquidated damages , and not as a <br /> penalty, the sum of $713 . 00 dollars per calendar day between the date Substantial Completion of <br /> the work ' is achieved and the Final 100% Completion date and or Acceptance by the County for <br /> each and every day or part of a day thereafter that said work remains incomplete . <br /> 22 . SPECIAL PROVISIONS <br /> The Contractor shall comply with the following special provisions as part of the contract for the 12th <br /> Street Sidewalk Improvements Project: <br /> ( 1 ) (A) BASE BID- TIMEFRAME <br /> The total time for the project construction will commence with a Written Notice to <br /> Proceed from the County that is anticipated to be issued to the Contractor on April 3 , <br /> 2006 with the project being substantially completed by the Contractor on November <br /> 30 , 2006 and totally 100 % completed by the Contractor on December 31 , 2006 . <br /> ( B ) CPM SCHEDULE AND NARRITIVE <br /> The Contractor shall submit to the County as part of his bid submission , a detailed <br /> construction schedule in CPM format outlining the proposed progress of the work to <br /> be performed by the Contractor and his subcontractors for the BASE BID — <br /> TIMEFRAME . <br /> The Contractors CPM schedule for the BASE BID — TIMEFRAME shall include but <br /> not be limited to the demolition phasing dates of the work , manufacturing dates of all <br /> components , all phasing dates of the total work required for each component to be <br /> manufactured and installed , the start and completion dates for each phase of the <br /> individual components to be installed , street closure dates and durations including <br /> the start and completion dates of each phase . <br /> 55 <br /> F :\Engineering\Capital Projects\0604- 12th St Sidewalk Improve between 43rd Ave & 27th Ave\0604 Federal <br /> Contract Provisions .doc a2ww8 s:zosa gut <br />
The URL can be used to link to this page
Your browser does not support the video tag.