My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:42:51 PM
Creation date
10/1/2015 1:02:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW amd 43rd Ave/ Bridge Replacement
Area
5th St.SW amd 43rd Ave/
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Work will be substantially completed on or before the 210 day after the date when the <br />Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 240 day after the date when the Contract <br />Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times <br />specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. Liquidated damages will commence for this portion of <br />work. The parties also recognize the delays, expense, and difficulties involved in proving in <br />a legal proceeding the actual loss suffered by OWNER if the Work is not completed on <br />time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR <br />agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $1,423.00 for each calendar day that expires after the time specified in <br />paragraph 4.02 for Substantial Completion until the Work is substantially complete. After <br />Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the <br />remaining Work within the Contract Time or any proper extension thereof granted by <br />OWNER, CONTRACTOR shall pay OWNER $1,423.00 for each calendar day that expires <br />after the time specified in paragraph 4.02 for completion and readiness for final payment <br />until the Work is completed and ready for final payment. <br />ARTICLE 5 = CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.6, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:: <br />Numerical Amount: <br />Written Amount: <br />ARTICLE 6 = PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 <br />of the General Conditions. Applications for Payment will be processed by <br />ENGINEER as provided in the General Conditions and the Contract Documents, <br />6.02 Progress Payments. <br />A. The OWNER shall make progress payments to the CONTRACTOR on the basis of <br />the approved partial payment request as recommended by ENGINEER in <br />Agreement.doc <br />00520-3 <br />FAPurchasing\Bids12007-2008 FY (2008000)12008075 5th St SW and 43rd Ave Bridge Replacement\Agreement.dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.