My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:46:49 AM
Creation date
10/1/2015 1:02:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW amd 43rd Ave/ Bridge Replacement
Area
5th St.SW amd 43rd Ave/
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Payment and Performance Bonds . <br /> ARTICLE 7 = INDEMNIFICATION <br /> 7 .01 CONTRACTOR shall indemnify OWNER , ENGINEER , and others in accordance with <br /> paragraph 6 .20 ( Indemnification) of the General Conditions to the Construction Contract . <br /> ARTICLE 8 = CONTRACTOR ' S REPRESENTATIONS <br /> 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations : <br /> A . CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost, progress , and performance of the <br /> Work. <br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work . <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4 .02 of the General Conditions and (2) reports and <br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4. 06 of the General <br /> Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations , investigations , explorations , tests , <br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities) <br /> at or contiguous to the Site which may affect cost, progress , or performance of the Work <br /> or which relate to any aspect of the means , methods, techniques , sequences , and <br /> procedures of construction to be employed by CONTRACTOR , including applying the <br /> specific means , methods , techniques , sequences , and procedures of construction , if any, <br /> expressly required by the Contract Documents to be employed by CONTRACTOR , and <br /> safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents , <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> Agreement.doc <br /> 00520 - 5 <br /> FAPurchasin9\B1ds\2007-2008 FY (2008000)\2008075 5th St SW and 43rd Ave Bridge ReplacementWgreerrent.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.