Laserfiche WebLink
5.08 Receipt and Application of Insurance <br />Proceeds <br />A'. Any iRswFed loss wndeF the PQIiGie& .4 <br />insurance required by paragraph 5.06 will beadjust <br />with OWNER and made payable to OWNER as <br />fiduciary for the insured/h8 <br />their interests may <br />appear, subject to the reqnts of any ap icable <br />mortgage clause and of paph 5.08.B. WNER <br />shall deposit in a separaount any oney so <br />received and shall distributaccorda ce with such <br />agreement as the parties iest y reach. If no <br />other special agreement ch the damaged <br />Work shall be repaired orc d, the moneys so <br />received applied on accoreof, and the Work <br />and the cost thereof coby an appropriate <br />Change Order or Written Ament. <br />B. OWNER as fi ciary shall have power to <br />adjust and settle any I s with the insurers unless one <br />of/OWNER <br />rties in inter_ st shall object in writing within 15 <br />der the currence of loss to OWNER 's <br />eof this ower. If such objection be made, <br />Oas fi uciary shall make settlement with the <br />inin cordance with such agreement as the <br />p ' terest may reach. If no such agreement <br />aa parties in interest is reached, OWNER as <br />fishall adjust and settle the loss with the <br />inand, if required in writing by any party in <br />inOWNER as fiduciary shall give bond for the <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />objection to the coverage afforded by or other pr k <br />sions of the Bonds or insurance required t be <br />purchased and maintained by the other party i ccor- <br />dance with Article 5 on the basis of non -co rmance <br />with the Contract Documents, the objectin party shall <br />so notify the other party in writing withi 0 days after <br />receipt of the certificates (or her evidence <br />requested) required by paragraph .05.C. OWNER <br />and CONTRACTOR shall each rovide to the other <br />such additional information i respect of insurance <br />provided as the other ma reasonably request. If <br />either party does not pur ase or maintain all of the <br />Bonds and insurance quired of suchparty by the <br />Contract Documents uch party shall notify the other <br />party in writing of ch failure to purchase prior to the <br />start of the Wor or of such failure to maintain prior to <br />any change i the required coverage. Without <br />prejudice to ny other right or remedy, the other party <br />may elec o obtain equivalent Bonds or insurance to <br />protect uch other party's interests at the expense of <br />the rty who was required to provide such coverage, <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for. the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and <br />expressly required by the Contract Documents. CON- <br />TRACTOR shall be responsible to see that the <br />completed Work complies accurately with the Contract <br />Documents. <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident <br />superintendent thereto who shall not be replaced <br />without written notice to OWNER and ENGINEER <br />except under extraordinary circumstances. The <br />superintendent will. be CONTRACTOR's <br />representative at the Site and shall have authority to <br />act on behalf of CONTRACTOR. All communications <br />given to or received from the superintendent shall be <br />binding on CONTRACTOR. <br />6.02 Labor, Working Hours <br />A. CONTRACTOR shall provide competent, <br />suitably qualified personnel to survey, lay out, and <br />construct the Work as required by the Contract Docu- <br />00700 - General Conditions REV 04-07 <br />00700-18 <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\00700 . General Conditions REV 04-07.doc <br />- <br />- - <br />- - <br />._ <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for. the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and <br />expressly required by the Contract Documents. CON- <br />TRACTOR shall be responsible to see that the <br />completed Work complies accurately with the Contract <br />Documents. <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident <br />superintendent thereto who shall not be replaced <br />without written notice to OWNER and ENGINEER <br />except under extraordinary circumstances. The <br />superintendent will. be CONTRACTOR's <br />representative at the Site and shall have authority to <br />act on behalf of CONTRACTOR. All communications <br />given to or received from the superintendent shall be <br />binding on CONTRACTOR. <br />6.02 Labor, Working Hours <br />A. CONTRACTOR shall provide competent, <br />suitably qualified personnel to survey, lay out, and <br />construct the Work as required by the Contract Docu- <br />00700 - General Conditions REV 04-07 <br />00700-18 <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\00700 . General Conditions REV 04-07.doc <br />