My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:48:48 AM
Creation date
10/1/2015 1:03:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356A
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW Bridge Replacement
Area
5th St. and 43rd Avenue
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections , tests , and approvals that the results 2 . changes in the Contract Price or <br /> certified indicate compliance with , the Contract Contract Times which are agreed to by the <br /> Documents . parties, including any undisputed sum or <br /> amount of time for Work actually performed in <br /> E . The limitations upon authority and responsibil- accordance with a Work Change Directive; and <br /> ity set forth in this paragraph 9 . 10 shall also apply to <br /> ENGINEER's Consultants , Resident Project Repre- 3 , changes in the Contract Price or <br /> sentative, and assistants . Contract Times which embody the substance of <br /> any written decision rendered by ENGINEER <br /> ARTICLE 10 - CHANGES IN THE WORK; CLAIMS pursuant to paragraph 10 . 05; provided that, in <br /> lieu of executing any such Change Order, an <br /> appeal may be taken from any such decision in <br /> 10 .01 Authorized Changes in the Work accordance with the provisions of the Contract <br /> Documents and applicable Laws and Regula- <br /> A. Without invalidating the Agreement and tions, but during any such appeal , <br /> without notice to any surety, OWNER may, at any time CONTRACTOR shall carry on the Work and <br /> or from time to time, order additions , deletions , or adhere to the progress schedule as provided in <br /> revisions in the Work by a Written Amendment, a paragraph 6 . 18 .A. <br /> Change Order, or a Work Change Directive . Upon <br /> receipt of any such document, CONTRACTOR shall 10 . 04 Notification to Surety <br /> promptly proceed with the Work involved which will be <br /> performed under the applicable conditions of the A. If notice of any change affecting the general <br /> Contract Documents (except as otherwise specifically scope of the Work or the provisions of the Contract <br /> provided ) . Documents (including , but not limited to, Contract <br /> Price or Contract Times) is required by the provisions <br /> B . If OWNER and CONTRACTOR are unable to of any Bond to be given to a surety, the giving of any <br /> agree on entitlement to , or on the amount or extent, if such notice will be CONTRACTOR's responsibility. <br /> any, of an adjustment in the Contract Price or Contract The amount of each applicable Bond will be adjusted <br /> Times , or both , that should be allowed as a result of a to reflect the effect of any such change. <br /> Work Change Directive , a Claim may be made <br /> therefor as provided in paragraph 10 . 05 . <br /> 10 .02 Unauthorized Changes in the Work <br /> A. CONTRACTOR shall not be entitled to an <br /> increase in the Contract Price or an extension of the <br /> Contract Times with respect to any work performed <br /> that is not required by the Contract Documents as <br /> amended , modified , or supplemented as provided in <br /> paragraph 3 .04 , except in the case of an emergency <br /> as provided in paragraph 6 . 16 or in the case of <br /> uncovering Work as provided in paragraph 13 .04 . 6 . <br /> 10 .03 Execution of Change Orders <br /> A. OWNER and CONTRACTOR shall execute <br /> appropriate Change Orders recommended by ENGI - <br /> NEER (or Written Amendments) covering : <br /> 1 . changes in the Work which are : (i) <br /> ordered by OWNER pursuant to paragraph <br /> 10 .01 .A, (ii) required because of acceptance of <br /> defective Work under paragraph 13 .08 .A or <br /> OWNER's correction of defective Work under <br /> paragraph 13 .09 , or (iii) agreed to by the <br /> parties ; <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 30 <br /> FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.