My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:48:48 AM
Creation date
10/1/2015 1:03:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356A
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW Bridge Replacement
Area
5th St. and 43rd Avenue
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . for completed and acceptable Work <br /> executed in accordance with the Contract <br /> Documents prior to the effective date of . <br /> termination , including fair and reasonable sums <br /> for overhead and profit on such Work; <br /> ARTICLE 16 - DISPUTE RESOLUTION <br /> 2 , for expenses sustained prior to the <br /> effective date of termination in performing <br /> services and furnishing labor, materials , or 16 .01 Methods and Procedures <br /> equipment as required by the Contract <br /> Documents in connection with uncompleted A. Dispute resolution methods and procedures , if <br /> Work, plus fair and reasonable sums for any, shall be as set forth in the Supplementary <br /> overhead and profit on such expenses; Conditions . If no method and procedure has been set <br /> forth , and subject to the provisions of paragraphs 9 .09 <br /> 3 , for all claims , costs , losses , and and 10 .05 , OWNER and CONTRACTOR may <br /> damages (including but not limited to all fees exercise such rights or remedies as either may <br /> and charges of engineers , architects , attorneys , otherwise have under the Contract Documents or by <br /> and other professionals and all court or Laws or Regulations in respect of any dispute . <br /> arbitration or other dispute resolution costs) in- <br /> curred in settlement of terminated contracts <br /> with Subcontractors, Suppliers, and others; and ARTICLE 1. 7 - MISCELLANEOUS <br /> 4 , for reasonable expenses directly <br /> attributable to termination . 17 . 01 Giving Notice <br /> B . CONTRACTOR shall not be paid on account A. Whenever any provision of the Contract <br /> of loss of anticipated profits or revenue or other eco- Documents requires the giving of written notice , it will <br /> nomic loss arising out of or resulting from such be deemed to have been validly given if delivered <br />in <br /> termination . person to the individual or to a member of the firm or <br /> to an officer of the corporation for whom it is intended , <br /> 15 .04 CONTRACTOR May Stop Work or or if delivered at or sent by registered or certified mail , <br /> Terminate postage prepaid , to the last business address known <br /> to the giver of the notice . <br /> A , <br /> 17 . 02 Computation of Times <br /> A. When any period of time is referred to in the <br /> Contract Documents by days , it will be computed to <br /> exclude the first and include the last day of such <br /> period . If the last day of any such period falls on a <br /> Saturday or Sunday or on a day made a legal holiday <br /> fe WN €R� and €N61N € €i�r, arm ^ r^� �' ' _ ^` ^ � " I � o by the law of the applicable jurisdiction , such day <br /> will <br /> be omitted from the computation . <br /> 17 .03 Cumulative Remedies <br /> A. The duties and obligations imposed by these <br /> remedy, of ENGINEER has failed —te�ant on ;F4 General Conditions and the rights and remedies avaik <br /> able hereunder to the parties hereto are in addition to , <br /> submitted , or Q_ 1.A1N' r_= R has failed for 39 days to pay and are not to be construed in any way as a <br /> limitation <br /> , of, any rights and remedies available to any or all of <br /> CONTRACTOR ' seven days rte a ItteRiG9 them which are otherwise imposed or available by <br /> to OWNIRR and €NG ! N € € R , stop Werk ui#4 Laws or Regulations , by special warranty or <br /> guarantee , or by other provisions of the Contract <br /> Documents , and the provisions of this paragraph will <br /> PFOV466ORS of this paFaqFaph 15 ,04 are nGt intended to be as effective as if repeated specifically in the <br /> Contract Documents in connection with each <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 44 <br /> FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.