My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:48:48 AM
Creation date
10/1/2015 1:03:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356A
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th Street SW Bridge Replacement
Area
5th St. and 43rd Avenue
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br /> GENERAL CONDITIONS <br /> SC -1 . 00 Introduction <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract ( No . 1910-8 , 1996 Edition ) and other provisions of the Contract <br /> Documents as indicated below. All provisions , which are not so amended or supplemented , <br /> remain in full force and effect. <br /> The terms used in these Supplementary Conditions will have the meanings indicated in the <br /> General Conditions . <br /> SC -1 . 01 Defined Terms <br /> SC- 1 . 01 . A. 20 . Delete paragraph GC 1 . 01 . A . 20 in its entirety. <br /> SC -2 .05 Before Starting Construction <br /> SC-2 . 05 . C . Delete paragraph GC 2. 05. 0 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER, nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 , 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place : <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the work and to discuss schedules referred to in paragraph 2 . 05 . 13 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to dis cuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards , <br /> 00800-1 <br /> 00800 - Supplementary Conditions REV 04-07 <br /> 008001 FAEngineering\Capital Projects\0206 Sth ST SW 8 43rd AVE Bridge Replacement 8 Roadway Improvements\CONTRACT BID\00800 - Supplementary Conditions <br /> REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.