Laserfiche WebLink
2 . Indian River Farms Water Control District <br /> 3 . Department of the Army Corps of Engineers <br /> C . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> D . The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC -6 . 10 Taxes <br /> SC-6 . 10 . A Delete paragraph GC-6. 10.A in its entirety and insert the following in its place: <br /> OWNER qualifies. for state- and- local sales -tax exemption in the purchase of. all- material and <br /> equipment <br /> SC -13 . 03 Test and Inspections <br /> SC- 13 . 03 . 6 . Delete the first sentence of paragraph GC- 13. 03 . 8 in its entirety, and insert the <br /> following sentences in its place: <br /> B . OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections , tests , or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below . Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or <br /> approvals shall be paid for by the CONTRACTOR by backcharge to subsequent <br /> . applications for payment. The CONTRACTOR shall arrange , obtain , and pay for the <br /> following inspections , tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below; <br /> 2 , costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13. 04 . 6 ; <br /> 3 * tests otherwise specifically provided in the Contract Documents . <br /> 13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 .A. Delete paragraph GC- 13. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> 00800-6 <br /> 00800 - Supplementary Conditions REV 04-07 <br /> 00800 6F:\Engineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\00800 - Supplementary Conditions <br /> REV 04-07 .doc <br />