My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:48:48 AM
Creation date
10/1/2015 1:03:24 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI- <br /> the Effective Date of the Agreement (unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements), CONTRAC- accordance with paragraph 2 .05 .6 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified 1 . The progress schedule will be <br /> in the Contract Documents ; <br /> acceptable to ENGINEER if it provides an <br /> 2 , a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> m.itting , reviewing , and processing such impose on ENGINEER_ responsibility for the <br /> submittal ; and progress schedule, for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 , a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work. <br /> 3 . CONTRACTOR's schedule of values <br /> Q . 4denG9 of �qlnlura_ nne & will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work. <br /> Conditions , certificates of ' urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> evidence of insuranc ich either of them or any AMENDING , REUSE <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are 3 . 01 Intent <br /> a RtaiR OR -Ge With <br /> A. The Contract Documents are comple- <br /> 2 .06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all , <br /> As. !iA� ithii:i 20 days a#9F the G to run , but before any <br /> nTRA <br /> j e is started , a B . It is the intent of the Contract Documents to <br /> conference y CONCTOR, ENGINEER, describe a functionally complete Project (or part there- <br /> conference <br /> ers as appropriate will be held to establish a of) to be constructed in accordance with the Contract <br /> Documents . Any labor, documentation , services , <br /> materials, or equipment that may reasonably be <br /> inferred from the Contract Documents or from <br /> ' prevailing custom or trade usage as being required to <br /> ' produce the intended result will be provided whether. <br /> Paym ' or not specifically called for at no additional cost to <br /> OWNER. r <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 9 <br /> FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BI13\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.