Laserfiche WebLink
progresses. Control delivery schedules so as to minimize unnecessary long-term <br />storage at the project site prior to installation. <br />1.5 PROJECT PHOTOGRAPHS/VIDEOS <br />A. The CONTRACTOR shall make provisions, at his expense, for photographs and <br />video tapes of all work areas just prior to construction, and for unusual conditions <br />during construction. The photographs and videos shall show pertinent physical <br />features along the line of construction. The purpose of the photographs and video <br />is to determine any damage to private or public property during construction. <br />B. Pre -Construction Photographs and Video: <br />1. Contractor shall provide the Owner with a photograph and video record and one <br />copy of the existing conditions prior to construction. This photograph and video <br />shall be a standard DVD format, and shall be narrated. <br />2. The photographs and video shall include,but not be limited to, the following <br />items shown in a clear manner: <br />1) All existing features within the right-of-way. <br />2) All existing features within the temporary construction easement. <br />3) All existing features within permanent easements. <br />4) All existing features adjacent to any construction. <br />3. Detail of the photographs and video shall be such that the following examples <br />shall be clear and visible: <br />1) Cracks in walls. <br />2) Condition of fencing. <br />3) Condition of planted areas and types of vegetation. <br />4) Condition of sodded areas. <br />5) Conditions of sprinkler systems and associated controls and wiring. <br />6) Condition of signs. <br />7) Conditions of lighting and associated wiring. <br />8) Significant detail of any pre-existing damages physical features shall be <br />shown. The coverage of the photographs and video should include the <br />limits of effects of the use of vibratory rollers. <br />9) This photograph and video record shall be presented to the Owner <br />within 30 days of the Notice to Proceed. A copy shall be kept in the <br />Contractor's field office. <br />10)Payment — No additional payment will be made for this work. <br />+ + END OF SECTION + + <br />01215-2 01215 General Quality Control <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT <br />BID\01215 General <br />Quality.doc <br />