My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:50:50 AM
Creation date
10/1/2015 1:03:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St. SWand 43rd.Ave. Bridge Replacement
Area
5th St. and 43rd Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 - Submittal of Shop Drawings <br /> 1 . 5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS , PRODUCT DATA AND SAMPLES <br /> A . The CONTRACTOR' s responsibilities for submittal of shop drawings , <br /> product data , and samples are set forth in paragraph 6 . 17 of the General <br /> Conditions and as further explained herein . <br /> Be Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work . Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all. of which are the CONTRACTOR' s <br /> • responsibility . <br /> 1 . It is CONTRACTOR'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents , <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> without review . <br /> Co The CONTRACTOR's responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER' s review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in -the-field <br /> measurements , prior to submittal to the ENGINEER for his review . <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents . The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER' s review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> E . Begin no work, which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> been reviewed . <br /> 01340 - Submittal of Shop Drawings <br /> 01340=2 <br /> FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\01340 - Submittal of <br /> Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.