My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 108-1 - AS -BUILT DRAWINGS <br />1.1 GENERAL <br />A. Maintain and provide the ENGINEER with record documents as specified <br />below, except where otherwise specified or modified in Divisions 2-16 or the <br />Supplementary Conditions. <br />B. Maintenance of Documents: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following: Drawings, Specifications, Addenda, <br />approved. Shop Drawings, samples, photographs, Change Orders, other <br />modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work, <br />2. Provide files and racks for proper storage and easy access. <br />3. Make -documents available at all times.for inspection. by ENGINEE_ R and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove <br />them from the field office. <br />C. Recording: <br />1. Label each document "PROJECT RECORD" in 2 -inch high printed letters. <br />2. Keep record documents current. <br />3. Do not permanently conceal any Work until required information has been <br />recorded. <br />1.2 RECORD DRAWINGS <br />During the entire construction operation, the CONTRACTOR shall maintain <br />records of all deviations from the Drawings and Specifications and shall <br />prepare therefrom "record" drawings showing correctly and accurately all <br />changes and deviations from the work, made during construction to reflect the <br />work as it was actually constructed. The following items are required to be <br />shown on County project record drawings: <br />1. Right-of-way Swale/Drainage — All culvert inverts; inlet grate and bottom <br />elevations; swale beginning and end bottom elevations; and highs and lows <br />along top of bank. Size of swale. <br />2. Pipe Culvert/PVC. Sleeves — All inverts, stations and offsets. <br />3. Outfalls — All pipe inverts, weir box elevations, weir elevation, and sizes. <br />4. Roadway/Off Site Drainage— All inverts; manhole top elevation; grate top <br />elevations. <br />01025-12 Technical Specifications <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT <br />BID\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.