My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
View images
View plain text
under this item. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item 110 - Clearing and Grubbing . Lump Sum <br />The provisions of Special Provisions, Paragraph 9 shall be applicable and the costs thereof <br />included under this item. <br />ITEM NO. 113 — CONSTRUCTION SCHEDULES <br />1.1 GENERAL REQUIREMENTS <br />A. No partial payments shall be approved by the ENGINEER until there is an <br />. approved construction progress schedule on hand. <br />B. Designate an authorized representative who shall be responsible for <br />development and maintenance of the schedule and of all progress and <br />payment reports. This representative shall have direct project control and <br />complete authority to act on behalf of the CONTRACTOR in fulfilling the <br />commitments of the CONTRACTOR's schedules. <br />1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br />When the ENGINEER requires the CONTRACTOR to submit revised (updated) <br />progress schedules on a monthly basis the CONTRACTOR shall: <br />A. Indicate the progress of each activity to the date of submission. <br />B. Show changes occurring since the previous submission listing: <br />1. Major changes in scope. <br />2. Activities modified since the previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended and its effect. <br />3. The effect of changes on schedules of other prime contractors. <br />1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br />On or before the tenth day after the effective date of the Agreement, submit the. <br />01025-16 Technical Specifications <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE-Bddge Replacement & Roadway Improvements\CONTRACT <br />BID\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).