Laserfiche WebLink
J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the <br />establishment of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. <br />Clippings shall be removed from sidewalk. <br />K. Article 575-5. The first two paragraphs under this Article are deleted and the <br />following substituted: <br />The contract unit price for sodding shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of <br />clippings, water, tools, equipment, labor and all other incidentals necessary. <br />L. Payment shall be made under: <br />Item No.: 575-1-1 - Sodding (Bahia) - Per Square Yard <br />Item No.: 575-1-A — Hydro Seed - Per Square Yard <br />Item - 580 Landscape Installation <br />A. Sub -article 580-3.1 Delivery is modified by the addition of the following: <br />The Cabbage Palm and the Live Oaks specified in the Itemized Bid Schedule will <br />be delivered to the County owned 6 acre tract of land just off of Oslo Road <br />across from the University of Florida's Entomology Lab and adjacent to the <br />existing Oslo Riverfront Conservation Area. <br />B. Sub -article 580-3.2 Layout is modified by the addition of the following. <br />Mark proposed planting beds and individual locations of trees and plants per the <br />direction of Ken Oristaglio, Senior Environmental Planner (Environmental <br />Department: Tel 772-226-1215). <br />Make no changes to the layout, materials or any variations of plant materials <br />from the Contract Documents without the written approval of Ken Oristaglio. <br />Item —1000- Water and Sewer Utilities <br />A. Water Utilities <br />The water utilities for this project shall be constructed per the "Indian River County <br />01025-22 Technical Specifications <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT <br />BID\Technical Specifications.doc. <br />