Laserfiche WebLink
stabilization. <br />22. All wetland areas or water bodies that are outside the specific limits of construction <br />authorized by this permit must be protected from erosion, siltation, scouring or excess <br />turbidity, and dewatering. <br />23. Prior to construction, the permittee must clearly designate the limits of construction on-site. <br />The permittee must advise the contractor that any work outside the limits of construction, <br />including clearing, may be a violation of this permit. <br />24. The project must be constructed and operated in accordance with the plans and information <br />received by the District on January 23, 2006, <br />25. The stormwater management system must be inspected by the, operation and maintenance <br />entity once within two years after the completion of construction and every two years <br />thereafter to insure that the system is functioning as designed and permitted. If a required <br />inspection reveals that the system is not functioning as designed and permitted, then within <br />14 days of that inspection the entity shall submit an Exceptions Report on form number 40C- <br />42.900(6), Exceptions Report for Stormwater Management System Out of Compliance. The <br />operation and maintenance entity must maintain a record of each required inspection, <br />including the date of inspection, the name, address, and telephone number of the inspector, <br />and whether the system was functioning as designed and permitted, and make such record <br />available for inspection upon request by the District during normal business hours. <br />