My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110 . CLEARING AND GRUBBING <br /> A Payment for Clearing and Grubbing shall include compensation for : the <br /> removal and disposal of concrete , sidewalks , curbing , abandoned utilities <br /> ( including pipes , cables , conduit and structures ) , existing walls , riprap , <br /> various types of fences , septic tanks , drain fields , pump stations , motor <br /> boxes , pumps , irrigation apparatus , base material , trimming of trees and <br /> shrubs , drainage structures , pipe , backfilling the removal excavations , plus <br /> all other items necessary to be removed to construct the project . All non - <br /> salvageable materials removed shall remain property of the Contractor <br /> unless otherwise directed by the Engineer or Owner . All unwanted materials <br /> shall be removed and suitably disposed of by the Contractor outside the <br /> project limits . Any salvage value received from the removed materials shall <br /> be reflected in the Contractor' s proposal . <br /> B . Clear and grub within the entire limits of the right- of-way except in specific <br /> areas designated by the Engineer to remain for aesthetic purposes . Also <br /> clear and grub all existing exotics on the project eastern burm . <br /> C . Existing and temporary asphaltic pavement and excess subsoil shall be <br /> disposed of outside the project by the Contractor , at a location and in a <br /> manner approved by the Engineer . <br /> D . Removal of existing pavement includes all removal and disposal of the <br /> asphalt within the limit shown on the plans . <br /> E . Payment shall be made under : <br /> Item No . 110 - 1 Clearing and Grubbing — Lump Sum <br /> ITEM NO . 120 — GRADING , EXCAVATION AND FILL <br /> The work specified in this item shall conform to Section 120 of the Florida Department of <br /> Transportation Specifications for Road and Bridge Construction . ( Latest Edition ) <br /> This item shall include all excavation of whatever kind , including subsoil , if necessary , for <br /> the roadway , drainage channels , removal of existing pavement , structures and any other <br /> work normally included in Section 120 - 7 . Also included is all work necessary to construct <br /> all necessary fills , including compaction of same , normally included in Section 120 - 8 and <br /> 102 - 9 . Grading of swales and the construction of all earthwork necessary to achieve the <br /> final elevations , lines , grades and contours shown on the plans shall be included in this <br /> item . No other additional payment will be made for any earthwork , grading or excavation . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 120 - 6 FILL Cubic Yard Bid Item No . 120 - 1 Excavation , <br /> Regular Cubic Yard . <br /> F :\ Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - <br /> Technical Provisions . doc . 10 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.