Laserfiche WebLink
110 . CLEARING AND GRUBBING <br /> A Payment for Clearing and Grubbing shall include compensation for : the <br /> removal and disposal of concrete , sidewalks , curbing , abandoned utilities <br /> ( including pipes , cables , conduit and structures ) , existing walls , riprap , <br /> various types of fences , septic tanks , drain fields , pump stations , motor <br /> boxes , pumps , irrigation apparatus , base material , trimming of trees and <br /> shrubs , drainage structures , pipe , backfilling the removal excavations , plus <br /> all other items necessary to be removed to construct the project . All non - <br /> salvageable materials removed shall remain property of the Contractor <br /> unless otherwise directed by the Engineer or Owner . All unwanted materials <br /> shall be removed and suitably disposed of by the Contractor outside the <br /> project limits . Any salvage value received from the removed materials shall <br /> be reflected in the Contractor' s proposal . <br /> B . Clear and grub within the entire limits of the right- of-way except in specific <br /> areas designated by the Engineer to remain for aesthetic purposes . Also <br /> clear and grub all existing exotics on the project eastern burm . <br /> C . Existing and temporary asphaltic pavement and excess subsoil shall be <br /> disposed of outside the project by the Contractor , at a location and in a <br /> manner approved by the Engineer . <br /> D . Removal of existing pavement includes all removal and disposal of the <br /> asphalt within the limit shown on the plans . <br /> E . Payment shall be made under : <br /> Item No . 110 - 1 Clearing and Grubbing — Lump Sum <br /> ITEM NO . 120 — GRADING , EXCAVATION AND FILL <br /> The work specified in this item shall conform to Section 120 of the Florida Department of <br /> Transportation Specifications for Road and Bridge Construction . ( Latest Edition ) <br /> This item shall include all excavation of whatever kind , including subsoil , if necessary , for <br /> the roadway , drainage channels , removal of existing pavement , structures and any other <br /> work normally included in Section 120 - 7 . Also included is all work necessary to construct <br /> all necessary fills , including compaction of same , normally included in Section 120 - 8 and <br /> 102 - 9 . Grading of swales and the construction of all earthwork necessary to achieve the <br /> final elevations , lines , grades and contours shown on the plans shall be included in this <br /> item . No other additional payment will be made for any earthwork , grading or excavation . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 120 - 6 FILL Cubic Yard Bid Item No . 120 - 1 Excavation , <br /> Regular Cubic Yard . <br /> F :\ Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - <br /> Technical Provisions . doc . 10 - <br />