My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
templates . If using sheet metal templates , ensure that they are of the dimensions , and <br /> are set to the lines , shown in the plans . Hold templates firmly while placing the concrete . <br /> Leave templates in place until the concrete has set sufficiently to hold its shape , but <br /> remove them while the forms are still in place . <br /> Saw contraction joints , for machine placed items , unless the Engineer <br /> approves an alternate method . Saw the joints as soon as the concrete has hardened to <br /> the degree that excessive raveling will not occur and before uncontrolled shrinkage <br /> cracking begins . <br /> Space contraction joints at intervals of 10 feet [3 m ] except where closure <br /> requires a lesser interval , but do not allow any section to be less than 4 feet [ 1 . 2 m ] <br /> in <br /> length . <br /> 520 - 6 . 2 Expansion Joints : Construct expansion joints at all inlets , at all radius <br /> points , and at other locations indicated in the plans . Locate them at intervals of 500 feet <br /> [ 150 m ] between other expansion joints or ends of a run . Ensure that the joint is 1 /2 inch <br /> [ 13 mm ] in width . <br /> 520 - 7 Finishing . <br /> 520 - 7 . 1 Repair of Minor Defects : Remove the forms within 24 hours after placing <br /> the concrete , and then fill minor defects with mortar composed of one part portland <br /> cement and two parts fine aggregate . The Engineer will not allow plastering on the face <br /> of the curb . Remove and replace any rejected curb , curb and gutter , or valley gutter <br /> without additional compensation . <br /> 520 - 7 . 2 Final Finish : Finish all exposed surfaces while the concrete is still green . <br /> In general , the Engineer will only require a brush finish . For any surface areas , however , <br /> which are too rough or where other surface defects make additional finishing necessary , <br /> the Engineer may require the Contractor to rub the curb to a smooth surface with a soft <br /> brick or wood block , using water liberally . Also , if necessary to provide a suitable <br /> surface , the Engineer may require the Contractor to rub further , using thin grout or <br /> mortar . <br /> 520 - 8 Curing . <br /> 520 - 8 . 1 General : Continuously cure the concrete for a period of at least 72 hours . <br /> Commence curing after completely finishing and as soon as the concrete has hardened <br /> sufficiently to permit application of the curing material without marring the surface . <br /> Immediately replace any curing material removed or damaged during the 72 hour <br /> period . <br /> After removing the forms , cure the surfaces exposed by placing a berm of <br /> moist earth against them or by any of the methods described below , for the remainder <br /> of the 72 hour curing period . <br /> 520 - 8 . 2 Wet Burlap Method : Place burlap , as specified in 925 - 1 , over the entire <br /> exposed surface of the concrete , with sufficient extension beyond each side to ensure <br /> complete coverage . Overlap adjacent strips a minimum of 6 inches [ 150 mm ] . Hold the <br /> burlap securely in place such that it will be in continuous contact with the concrete at all <br /> times , and do not allow any earth between the burlap surfaces at laps or between the <br /> burlap and the concrete . Saturate the burlap with water before placing it , and keep it <br /> thoroughly wet throughout the curing period . <br /> 520 - 8 . 3 Membrane Curing Compound Method : Apply clear membrane curing <br /> compound or white pigmented curing compound , as specified in 925 - 2 , by a hand <br /> sprayer meeting the requirements of 350 - 3 . 10 , in a single coat continuous film at a <br /> uniform coverage of at least 200 square feet per gallon [0 . 2 L/ M2] , Immediately recoat <br /> any cracks , checks , or other defects appearing in the coating . Thoroughly agitate the <br /> curing compound in the drum prior to application , and during application as necessary <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\961 lA & 0001 - Technical <br /> Provisions.doc . 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.