My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . SPRINKLER HEADS : Sprinkler heads shall be of the type shown on the <br /> drawings . Filter screens shall be included with all spray heads . <br /> E . RISERS AND SWING JOINTS : <br /> 1 . Risers and swing joints shall be as detailed on the drawings . <br /> 2 . Risers for shrub heads shall be Schedule 40 PVC pipe . <br /> 3 . PVC Flex connections : Shall be Ag - Products heavy walled flexible <br /> PVC pipe or equal . Average length of each connection is referred to <br /> on the drawings . Special flex cement shall be utilized for making these <br /> connections . <br /> F . REMOTE CONTROL VALVES : Valves shall be as specified on the <br /> drawings . Use Teflon tape only on threaded connections . <br /> G . VALVE BOXES : Valve boxes shall be Ametek VP - 10 or approved equal . <br /> Install flush with finish grade as indicated on drawing . <br /> H . CONTROL WIRING : All wiring to automatic circuit valves shall be OF- 14 <br /> direct burial wire of a different color than the black and white wires used <br /> on the 115 volt A . C . power . Wiring from the controller to the valves shall <br /> be installed in same trench as the mainline where possible . All splices <br /> shall be made with Rain Bird snap -tite connectors , or approved equal . All <br /> wire shall be furnished in minimum 2 , 500 ' reels and spliced only at valve <br /> or tee locations . <br /> I . CONTROLLER : Controller shall be as specified on the drawings . <br /> J . PUMP : Shall be a centrifugal , high head type as specified on the <br /> drawings . <br /> K . STRAINER : Shall be by Vu Flo , or approved equal . <br /> PART 3 — EXECUTION <br /> 1 . GENERAL : The Contractor shall be responsible for full and complete coverage <br /> of all irrigated areas and shall make any necessary adjustments at no additional cost to <br /> the Owner . <br /> 2 . INSTALLATION <br /> A . EXCAVATING AND TRENCHING : <br /> 1 . Perform all excavations as required for the installation of the work <br /> included under this section , including shoring of earth banks to <br /> prevent cave - ins . Restore all surfaces , existing underground <br /> F : \Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Docmnents\The Enclave.doc\00205 - Landscape & Irrigation <br /> Specifications for Contract2 .doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.