My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location of inspection <br /> Weather conditions <br /> Condition of plants- identify by species , location and number <br /> of plants that no longer meet the specified minimum <br /> Condition of planting beds ( including mulching , mowing , <br /> weeding , fertilizing , watering and staking and guying <br /> ( if applicable ) <br /> Other comments <br /> Signature and seal of Contractor' s Landscape QC <br /> representative <br /> Submit the certified inspection report to the Owner within seven <br /> calendar days after the inspection is performed . Any corrections to <br /> the inspection report must be completed and resubmitted within <br /> three calendar days after notification by the Owner of a need for <br /> corrections . Any deficiencies noted on the inspection report must <br /> be corrected within ten days of notification from the County . <br /> Periodic random verifications may be performed by the County to <br /> ensure the quality of the plants and correctness of the Certified <br /> Landscape inspection report . <br /> F . Remove from the jobsite any surplus excavated material from plant <br /> holes unless otherwise directed by the Owner . Surplus is defined <br /> as material not needed after installation of plants per Contract <br /> Documents . Upon commencement of the plant installation , <br /> remove daily all landscape installation debris from the landscape <br /> locations described in the Contract Documents . Remove all excess <br /> staking and guying materials from the jobsite . <br /> G . The Contractor shall be responsible for the proper maintenance , <br /> survival and condition of all plants for a period of one year after final <br /> acceptance by the Owner . The Engineer may conduct interim <br /> inspections of all landscape items during the plant establishment <br /> period , as well as the end of the plant establishment period . The <br /> Contractor will be responsible for replacing , at no cost to the <br /> Owner , all plants found not to meet the minimum specifications <br /> within ten days after each inspection . <br /> Prior to the end of the establishment period , remove all staking and <br /> guying from the project . <br /> H . Payment shall be made under : <br /> Item No , BUF . 1 Canopy Tree Per EA <br /> Item No . BUF 2 Understory Tree Per EA <br /> Item No . BUF 3 Shrub Per EA <br /> + + END OF SECTION + + <br /> R\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00209 - Eagle Trace <br /> Landscape Specifications .doc <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.